To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Nikšić–Podgorica railway

From Wikipedia, the free encyclopedia

Nikšić–Podgorica railway
Overview
OwnerŽICG
Termini
Stations5
Service
Operator(s)ŽPCG
History
Opened1948
Technical
Line length56.4 km (35 mi)
Number of tracks1
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Old gauge760 mm (2 ft 5+1516 in) Bosnian gauge
Electrification25 kV, 50 Hz AC
Operating speed75–100 km/h (45–60 mph)
KML is from Wikidata
Nikšić–Podgorica railway
km
0.3
Nikšić
9.0
Stubica
14.4
Dabovići
17.3
Ostrog
21.0
Šobajići
23.3
Šumanovića Bare
25.6
Slap
34.4
Danilovgrad
38.3
Ljutotuk
43.7
Spuž
46.9
Pričelje
56.6
Podgorica
to Bar

The Nikšić–Podgorica railway is a railway connecting Montenegro's capital Podgorica and the country's second largest city, Nikšić. The line connects to the Belgrade–Bar railway and the Podgorica–Shkodër railway at Podgorica. It is operated by ŽICG.

YouTube Encyclopedic

  • 1/3
    Views:
    4 910
    1 623
    2 918
  • Train ride Podgorica - Niksic
  • zeljeznice crne gore,Rail transport in Montenegro,Montecargo
  • Czarnogóra / Montenegro - droga Żabliak - Niksic - Podgorica

Transcription

Overview

Nikšić–Podgorica is a 56.4-kilometre long (35.0 mi) standard-gauge railway. It passes through 12 tunnels of total length of 3,439 m (11,283 ft), and across nine bridges (overall length of 279 m (915 ft)), mostly following the Bjelopavlići plain along its corridor. The speeds on this line are between 75 and 100 km/h (45 and 60 mph). The line has five stations (Nikšić, Ostrog, Danilovgrad, Spuž and Podgorica) and seven halts.

History

The line was built as a narrow gauge 760 mm (2 ft 5+1516 in) Bosnian gauge railway in 1948. It was connected to the preexisting Nikšić–Bileća line. In 1965, the line was upgraded to standard gauge. The extension to Bileća was decommissioned in 1976.

The railway has primarily been used for transport of bauxite ore from the Nikšić mine to the Podgorica Aluminium Plant. Chronic lack of funds for maintenance resulted in operating speeds being reduced to 30 km/h (20 mph), and end of passenger service in 1992. Passenger service was reintroduced in 2012.

In 2006, thorough reconstruction and electrification of the line begun, with consortium of Czech companies (OHL ŽS "Brno", AŽD and EŽ) undertaking the construction works. The reconstruction was scheduled to be completed in 2009, but was completed only in 2012, due to funding problems. The entire project had a cost close to €72 million.

The reconstructed railway was officially opened on 1 October 2012, with operating speeds increased to 75–100 km/h (45–60 mph) range, and passenger service reintroduced. Three CAF Civity EMUs ordered by Railways of Montenegro specifically to serve this railway were scheduled to arrive in Montenegro in July 2013.

See also

References

External links

This page was last edited on 18 May 2023, at 14:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.