To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Nigeria Erosion and Watershed Management Project

From Wikipedia, the free encyclopedia

Nigeria Erosion and Watershed Management Project (NEWMAP) is a World Bank assisted project aimed at addressing the Nigerian gully erosion crisis in Southeastern Nigeria and land degradation in Northern Nigeria on a multi-dimensional scale.[1] This project was born out of the request for assistance made by President Goodluck Ebele Jonathan to World Bank in 2010. He requested for assistance in tackling severe gully erosion in Southern Nigeria, land degradation in Northern Nigeria and environmental insecurity.[2][3] The project is being monitored by the Federal Ministry of Environment. Some aspects of the project includes erosion and watershed management infrastructure investments, erosion and watershed management institutions and information services and climate change response.[4]

YouTube Encyclopedic

  • 1/3
    Views:
    3 069
    560
    408
  • Integrated Modelling and Management of Watershed Systems
  • Environmental Regulations | Enforcement Challenges | Nigeria (Richflood Environmental Webinar Series
  • Seminar 6: Transboundary water governance

Transcription

Background

The project was approved by the board on May 8, 2012, and commenced operation on September 16, 2013, with the appointment of Amos Abu, Ruth Jane Kennedy-Walker, Grant Milne as team leaders, the federal ministry of environment as the implementing agency and a total project cost of US$650 million and committed amount by World Bank of US$500 million. it is an 8-year project, expected to end on June 30, 2020.[5]

The project commenced full operation in 2013 with seven pilot states namely; Abia, Anambra, Cross River, Ebonyi, Edo, Enugu and Imo State which suffered threats by gully erosion to infrastructure and livelihood. In 2015, the project scaled to meet the environmental needs of twelve more States namely; Delta, Oyo, Sokoto, Gombe, Plateau, Kogi, Kano, Akwa Ibom, Borno, Nasarrawa, Katsina and Niger states.[2]

Achievements

Some achievements of the project since its inception in 2010 includes;[6][7]

  • Giving grants to individuals that have been affected with erosion and land degradation activities in states under its jurisdiction to embark on other activities and also support their resettlement in new locations.
  • The project has also led to the installation of Meteorological stations, hydrological stations, automated flood early warning equipment across places that are on the bank of the rivers.
  • Creation of the special climate fund that is targeted at controlling gully erosion, flood and land risk and also rainfall issues that can lead to environmental issues.
  • Creation of gully catchment in different states in the area with high erosion and flooding issues in Nigeria.
  • Development of Nigeria Innovative Green bonds which seeks to fund projects that are related to environmental and climate issues in Nigeria.
  • Providing support for climate related environmental issues in Nigeria.

References

  1. ^ "Nigeria Erosion and Watershed Management Project | eConservation". econservation.jrc.ec.europa.eu. Retrieved 2022-09-02.
  2. ^ a b "About Us – NEWMAP". newmap.gov.ng. Archived from the original on 2020-04-08. Retrieved 2018-03-08.
  3. ^ "Federal Ministry of Environment - NEWMAP". environment.gov.ng. Retrieved 2018-03-08.
  4. ^ "Plateau NEWMAP | Nigeria Erosion and Watershed Management Project". newmapplateau.org. Archived from the original on 2022-09-02. Retrieved 2022-09-02.
  5. ^ "Projects : Nigeria Erosion and Watershed Management Project | The World Bank". projects.worldbank.org. Retrieved 2018-03-08.
  6. ^ "NEWMAP – Channels Television". Retrieved 2022-09-02.
  7. ^ "Nigeria - Erosion and Watershed Management Project : resettlement plan (Vol. 8) : Resettlement action plan for Eziala-Obizi gully erosion site Ezinihitte Mbaise, Imo state". World Bank. Retrieved 2022-09-02.

External links


This page was last edited on 1 November 2023, at 07:43
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.