To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

New York City Waterfalls

From Wikipedia, the free encyclopedia

Waterfall under the Brooklyn Bridge. The bridge in the background is the Manhattan Bridge.

New York City Waterfalls is a public art project by artist Olafur Eliasson, in collaboration with the Public Art Fund, consisting of four man-made waterfalls placed around New York City along the East River. The most famous was at the Brooklyn Bridge in lower Manhattan.[1][2] At $15.5 million, it is the most expensive public arts project since Christo and Jeanne-Claude's installation of The Gates in Central Park.[2][3] The waterfalls officially began flowing on June 26, 2008. They ran from 7 am to 10 pm (under illumination after sunset), until October 13, 2008.

YouTube Encyclopedic

  • 1/3
    Views:
    2 759
    1 326
    3 467 803
  • Olafur Eliasson's New York City Waterfalls
  • Waterfall - NYC • 3D Billboard @ One Times Square Building, Manhattan
  • CeCe Winans: Believe For It | FULL CONCERT | TBN

Transcription

Background

Location and construction

The Waterfall under the Brooklyn Bridge from the South Street Seaport
The Waterfall at Pier 35

The sites chosen for the four waterfalls were the East River Esplanade's Pier 35 in Manhattan; beneath the Brooklyn Bridge in DUMBO between piers 4 and 5, also in Brooklyn; and Governors Island to activate spaces that typically were not.[4]

Work on erecting the four support scaffolds began in mid-March, 2008. On the shore of Governors Island construction teams used pile driving to secure the scaffolding in place. This method was not used at the other locations for various reasons, including the effects of vibrations through car and subway tunnels. Once completed, the scaffolding would total 64,000 square feet (5,900 m2) and weigh 270 tons.[5] Eliasson has said that the scaffolds themselves were designed to blend in with their urban surroundings, but that he purposely did not try to conceal them, explaining he "want[s] people to know that this is both a natural phenomenon and a cultural one.”[2]

Construction involved the work of 108 different people, including two environmental consultants. The installation was designed to be ecologically-friendly. Some example of this are energy efficient LED lighting by USA based LED Lighting Designers & Manufacturers Boca Flasher, Inc., energy purchased from renewable sources[6] and the filters used to keep aquatic life from taking a ride up-and-over the waterfall.[2] When the project closed the materials were intended to be made available for re-use in a future project.[5]

Costs

The over $15 million project had no city funding and was paid for entirely by private organizations, business and donors. Mayor Michael Bloomberg's company, Bloomberg LP, donated $13.5 million.[3] With estimates that the waterfalls could generate up to $55 million for the local economies, the Lower Manhattan Development Corporation gave $2 million to the effort.[1][3]

Environmental impact

During the run, trees and shrubs along the Brooklyn Heights Promenade were damaged as a result of the saltwater blown into the parks during high winds. Several steps were taken to solve this problem which included cutting the running time to 50 hours a week instead of the original 101.[7] At the Brooklyn Bridge, the owner of The River Café claimed customer loss and plant replacements as a result of the winds on the falls.[8] The known damages were getting attention to the point that The Brooklyn Heights Association asked the committee to take down the falls after Labor Day, instead of the original date.[9]

References

  1. ^ a b Vogel, Carol (2008-01-15). "Waterfalls for New York City's Waterfront". The New York Times. Retrieved 2008-06-25.
  2. ^ a b c d Vogel, Carol (2008-06-02). "From a Master of Weather, 4 Waterfalls for New York". The New York Times. Retrieved 2008-06-25.
  3. ^ a b c Dobnik, Verena (2008-06-22). "NYC getting 'Waterfalls' off shore of Manhattan". Associated Press. Archived from the original on 2016-03-04. Retrieved 2008-06-25.
  4. ^ Kim, Angela (28 June 2008). "Weekend America: Waterfalls Along the East River". Weekend America. Archived from the original on 28 September 2011. Retrieved 14 July 2021.
  5. ^ a b Chan, Sewell (2008-06-16). "Waiting for the Water to Fall". The New York Times. Retrieved 2008-06-25.
  6. ^ "Launches The New York City Waterfalls Public Art Project by Artist Olafur Eliasson". nyc.gov. 2008-06-26. Retrieved 2008-06-28.
  7. ^ Portlock, Sarah (2008-09-04). "Victory! Taps tightened on tree-killing 'Waterfalls'". The Brooklyn Paper. Retrieved 2009-08-30.
  8. ^ Fernandez, Manny (2008-10-12). "Waterfalls Exit, but With Unintended Impact". The New York Times. Retrieved 2009-08-30.
  9. ^ "New York City 'Waterfalls' installation hours cut in half". Associated Press. 2008-08-30. Retrieved 2009-08-30.

External links

This page was last edited on 28 March 2024, at 21:21
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.