To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

New Guanjiao Tunnel

From Wikipedia, the free encyclopedia

New Guanjiao Tunnel
A portal of New Guanjiao Tunnel during construction in 2011
Overview
LineQinghai–Tibet Railway
LocationGuanjiao Mountain
Coordinates37°8′40″N 99°4′59″E / 37.14444°N 99.08306°E / 37.14444; 99.08306
Start37°10′58″N 99°10′38″E / 37.18278°N 99.17722°E / 37.18278; 99.17722
End37°0′33″N 98°52′50″E / 37.00917°N 98.88056°E / 37.00917; 98.88056
Operation
Work begun2007
Opened28 December 2014 (2014-12-28)
Traffictrain
Technical
Length32,645 metres (107,103 ft)
No. of trackstwo single
Track gauge1,435 mm (4 ft 8+12 in)
Electrifiedelectrified
Operating speed160 km/h
Highest elevation3,381 metres (11,093 ft)
Lowest elevation3,324 metres (10,906 ft)

New Guanjiao Tunnel [1](Chinese: 新关角隧道; pinyin: Xīn Guānjiǎo Suìdào) is a tunnel on the 2nd line of Qinghai–Tibet Railway in Guanjiao Mountain, Qinghai province. It is dual-bored, double-track rail tunnel. The total length of the tunnel is 32.645 km (20.285 mi), which made it at the time of completion the longest railway tunnel in China and fourth-longest in the world.

China Railway First Survey and Design Institute is responsible for the design. The New Guanjiao Tunnel was designed for two parallel single-track tunnels with speeds of up to 160 kilometres per hour (99 mph). The total construction duration was projected to be 5 years. The tunnel was bored in difficult geological conditions and high altitude, exceeding 3,300 metres (10,800 ft) above sea level. The construction started in 2007 and was completed in April 2014.[2] The tunnel was opened on 28 December 2014.[3]

The tunnel's northeastern portal (37°11′00″N 99°10′40″E / 37.1834°N 99.1778°E / 37.1834; 99.1778) is in Tianjun County, the southwestern portal (37°00′34″N 98°52′50″E / 37.0094°N 98.8805°E / 37.0094; 98.8805) is in Ulan County.

YouTube Encyclopedic

  • 1/2
    Views:
    4 183
    387
  • Qinghai tibet Railway
  • Japan Holy Mountain Tunnel

Transcription

References

This page was last edited on 23 April 2024, at 16:08
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.