To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Pagidipalli–Nallapadu section

From Wikipedia, the free encyclopedia

Pagidipalli–Guntur section
Route map of Guntur Division showing
Pagidipalli–Nallapadu section
Overview
StatusOperational
OwnerIndian Railways
LocaleTelangana
Andhra Pradesh
Termini
Websitescr.indianrailways.gov.in
Service
Operator(s)South Central Railway zone
History
Opened1930; 94 years ago (1930)
Technical
Line length238.49 km (148 mi)
Track length130 km (81 mi)
Number of tracks1 (doubling approved in year 2023)
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification25 kV AC 50 Hz
Operating speed110 km/h (68 mph)
Route map

km
0
Guntur Mainline rail interchangeBus interchangeParking
5
Nallapadu
13
Bandarupalle
19
Mandapadu
22
Siripuram
26
Lingamguntla
30
Peddakurapadu
36
Gudipudi
42
Sattenapalle
54
Reddigudem
60
Bellamkonda
74
Piduguralla
83
Tummalacheruvu
95
Nadikudi
108
Pondugula
112
Vishnupuram
115
Damacherla
122
Kandrapole Halt
134
Miryalaguda
154
Tipparthi
171
Nalgonda
182
ShriRampuram
192
Narketpalli
198
Chityala
204
Ramannapet
219
Valigonda
222
Mamdapur
229
Nagireddipalli
241
Bommaipalli
to Warangal
245
Pagidipalli
km

The Pagidipalli– Guntur section [1]is an electrified single track railway section in Guntur railway division of South Central Railway.[2][3]

YouTube Encyclopedic

  • 1/1
    Views:
    1 142
  • Guntur Nallapadu Journey Compilation Live Video || Guntur Railway Station

Transcription

History

The Guntur–Macherla section was opened in 1930. A new railway line from Bibinagar to Nadikudi was started in 1974 and foundation stone was laid by then Prime minister of India Indira Gandhi on 7 April 1974 and opened for traffic in 1989 there by making connectivity between Guntur Junction and Secunderabad Junction.[4]

In 2023 the Centre cleared the doubling of Guntur-Bibinagar railway. The long-pending project is estimated to cost 2,853 crore and will be monitored by the Prime Minister's Office.[5][6]

Route

This route starts from Pagidipalli (near Bibinagar) and passes through Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalle and joins Nallapadu near Guntur.[2]

References

  1. ^ "Details of Railway Projects (Doublingl, Electrification etc.)". www.pib.nic.in. Retrieved 6 April 2017.
  2. ^ a b "Evolution of Guntur Division" (PDF). South Central Railway. pp. 1–4. Retrieved 30 November 2015.
  3. ^ "Jayadev demands more railway facilities in new capital". The Hans India. 12 March 2015. Archived from the original on 19 November 2015. Retrieved 18 January 2016.
  4. ^ "South Central Railway: Time Line and Milestones of Events (SCR)". Archived from the original on 5 February 2015. Retrieved 4 September 2013.
  5. ^ "Centre clears doubling of Guntur-Bibinagar rail project in Telangana". The Times of India. 27 February 2023.
  6. ^ "Central government approves doubling of Guntur-Bibinagar railway track". The Times of India. 17 August 2023.
This page was last edited on 16 February 2024, at 14:03
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.