To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Nagarjuna Sagar tail pond

From Wikipedia, the free encyclopedia

Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft.[1] The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.[2]

810 MW peaking power station at the toe of Nagarjuna Sagar dam

YouTube Encyclopedic

  • 1/5
    Views:
    1 377
    365
    704
    349
    346
  • Srisailam Dam
  • Nagarjuna Sagar Dam Trip | Amazing top Views | Get In Telugu || Full Dam view ||
  • Dummugudem Tail Pond On River Godavari || Aswapuram || Manuguru || TELANGANA
  • Eleshwaram Mallana Temple - Mysterious Island - Nagarjuna Sagar
  • Nagarjuna Sagar Main Power House||Telangana||India 2020

Transcription

Hydro electricity generation

Two units of 25 MW each hydro power generation units were commissioned in the year 2017 by APGENCO to utilize the head available across the dam from the river flood water and the water released to Prakasam Barrage requirements.[3]

Peaking power generation

Presently, the 700 MW reversible hydro turbines (7 x 100 MW) located at the toe of Nagarjuna Sagar Dam are unable to operate in pumping mode due to non availability of tail pond for storing the released water during the power generation mode. With the completion of tail pond, surplus electricity from the electricity grid would be used for pumping the water back to the Nagarjuna Sagar reservoir and recycled for meeting peaking load on daily basis. Thus surplus electricity is consumed when it is available and used to meet the peak electricity requirements without letting the water out of the Nagarjuna Sagar tail pond. 700 MW peaking power for eight hours duration can be met from the one Tmcft of live storage water capacity available in the tail pond.

Irrigation potential

200 Tmcft surplus water annually from the Godavari River is planned to be fed into this tail pond by the Dummugudem Lift Irrigation Scheme which is under execution. The water transferred to this tail pond will be pumped to the upstream 410 Tmcft gross water storage capacity Nagarjuna Sagar reservoir to feed its right and left bank canals. Thus Nagarjuna Sagar reservoir need not receive the water supply from the upstream Srisailam reservoir. As the tail water level (48.33 m MSL) of this dam is below the full reservoir level (53.34 m MSL) of the downstream Pulichintala dam, surplus water in Pulichinthala reservoir can be pumped by envisaging pumped storage units from Pulichinthala reservoir to Nagarjunasagar reservoir via this pond. The retained water in the Srisailam reservoir would be used for upstream water uses from Jurala and Srisailam reservoirs for irrigation needs in uplands of Telangana and Rayalaseema regions. The water from the Nagarjuna Sagar reservoir can also be pumped to the Srisailam reservoir by Srisailam left bank hydro electric power station (900 MW) in pumping mode in case of severe drought in Krishna river basin. Koilsagar lift irrigation project (near 16°23′49″N 77°39′30″E / 16.39694°N 77.65833°E / 16.39694; 77.65833), Rajiv Bheema lift irrigation project, Nettampadu lift irrigation project (near 16°18′58″N 77°40′21″E / 16.31611°N 77.67250°E / 16.31611; 77.67250), Kalwakurthy lift irrigation scheme, Srisailam Left Bank Canal, Telugu Ganga irrigation project, Handri Neeva lift irrigation project, Galeru Nagari irrigation project, Veligonda irrigation project etc. which are in advanced stage of construction, are depending on the Krishna river water available at Jurala / Srisailam dams.

A lift canal from the Krishna river (16°42′50″N 80°08′24″E / 16.71389°N 80.14000°E / 16.71389; 80.14000 at 20 m MSL) downstream of Pulichintala dam will be executed to feed Godavari water diverted from Polavaram to some of the existing command area (situated below 60 m MSL) under Nagarjuna Sagar right bank canal to facilitate extension of Nagarjuna Sagar right bank canal connecting to Kandaleru feeder canal / Somasila reservoir.

Alternate to Dummugudem to Nagarjuna Sagar tail pond link canal

Dummugudem to Nagarjuna Sagar tail pond link canal is entirely located in Telangana region and needs to be routed through high lands which necessitate more pumping head.[4] An alternative link canal to Nagarjuna Sagar tail pond from Polavaram dam is also economically feasible to transfer Godavari water. This link canal passes entirely through the coastal Andhra Pradesh region only.

Joint projects with Karnataka

The Rajolibanda barrage is not receiving adequate continuous flows due to excessive water utilization in its catchment area in Karnataka. The lower Tungabhadra basin badly needs water augmentation from the adjacent Krishna river. This is achieved with a 20 km long tunnel from Narayanpur reservoir to the Maski nala reservoir / tank situated at 475 m MSL for drawing nearly 250 tmcft Krishna river water.[5] It would also provide additional water to bring more area under irrigation in uplands of Raichur & Mahboobnagar districts. Reliable Krishna river water can be supplied instead of unreliable Tungabhadra river water to the existing Tungabhadra Left bank canal in Raichur district, existing Tungabhadra right bank low level canal, the existing Rajolibanda left bank canal and the existing 150 years old K. C. Canal. Thus substantial Tungabhadra reservoir water would be saved for utilization in upstream new projects and reliable Krishna river water supply is ensured to existing projects.

A new barrage (FRL 349 m MSL) across the Krishna river just downstream of Bhima river confluence point on the common border of Karnataka and Andhra Pradesh states (near 16°24′25″N 77°17′21″E / 16.40694°N 77.28917°E / 16.40694; 77.28917), can also be taken up to supply Krishna river water by lift irrigation to the westernmost parts of Mahbubnagar district and high lands lying east of Bhima river in Karnataka.

Ultimately, 500 tmcft water is to be transferred annually from the Godavari river to this pond for meeting various water needs in Andhra Pradesh. Thus Nagarjuna Sagar tail pond will play pivotal role to put to use the water from the Godavari River in all regions of the Andhra Pradesh state.

See also

References

  1. ^ "Nagarjuna Sagar tail-pond dam likely to benefit Krishna delta". The Hindu. 14 November 2004. Archived from the original on 5 December 2004. Retrieved 11 May 2013.
  2. ^ "Nagarjuna Sagar tail pond dam progress report". Archived from the original on 9 March 2013. Retrieved 11 May 2013.
  3. ^ "Nagarjunasagar Tail Pond Power House PH01598". Archived from the original on 12 July 2018. Retrieved 7 August 2016.
  4. ^ "JYOTHI RAO PULE DUMMUGUDEM NAGARJUNA SAGAR SUJALA SRAVANTHI". Retrieved 19 July 2015.
  5. ^ "Maskinala D05465". Retrieved 15 August 2015.[permanent dead link]

16°37′42″N 79°29′21″E / 16.62833°N 79.48917°E / 16.62833; 79.48917

This page was last edited on 21 September 2023, at 21:33
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.