To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

The safety distance (safe-braking distance) between trains in fixed block and moving block signalling systems

In railway signalling, a moving block is a signalling block system where the blocks are defined in real time by computers as safe zones around each train. This requires both knowledge of the exact location and speed of all trains at any given time, and continual communication between the central signalling system and the train's cab signalling system. Moving block allows trains to run closer together (reduced headway) while maintaining required safety margins, thereby increasing the line's overall capacity. It may be contrasted with fixed block signalling systems.

Communications Based Train Control (CBTC) or Transmission Based Signalling (TBS) is required to detect the exact location of trains and to transmit back the permitted operating speed to enable this flexibility.[1] Information about train location can be gathered through active and passive markers along the tracks, and train-borne tachometers and speedometers. Satellite-based systems are not used because they do not work in tunnels.

Another version of the moving block system would be the location computers on the trains itself. Each train determines its location in relation to all the other trains and sets its safe speeds using this data. Less wayside equipment is required compared to the off-train system but the number of transmissions is much greater.[citation needed]

YouTube Encyclopedic

  • 1/3
    Views:
    918 597
    952
    186 856
  • Controlling Trains - Network Rail engineering education (3 of 15)
  • Thales Cybersecurity CBTC 2017 Silent Version
  • Chinese train that goes THROUGH a block of flats : Astonishing video : Chongqing Mountain City

Transcription

[train passing] ♪ pizzicato background music ♪ (Narrator) Britain's rail network transports 3 million passengers and 400,000 tonnes of freight a day. With hundreds of trains using it at any one time. All this traffic presents us with a safety challenge. Trains are guided by rails, so it's impossible for them to swerve or pull over. Trains are heavy, can't stop quickly and frequently operate at speeds which do not enable them to halt within sighting distance of the driver. Under these circumstances, one might assume that trains are prone to collision. In fact, rail is the safest mode of transport in Britain. And that's because trains are carefully controlled. Hence our responsibility at Network Rail to control them. Signalling is the control process Network Rail uses to operate trains safely, over the correct route and to the proper time-table. The two key features of this process are line-side signals and the block system. Trains can't collide if they're not permitted to occupy the same section of track at the same time. So the network is divided into sections known as "blocks". Normally, only one train is permitted in each block at any one time. The British rail network uses line-side signals to advise the driver of the status of the section of track ahead. Most line-side signals are in colour light form, but a significant number of semaphore signals remain on secondary lines. The semaphore consists of a mechanical arm that raises to signify go or lowers into the horizontal to signify stop. The most modern signals have 4 colour aspects. A green light indicates clear. A double yellow indicates that the next signal will be a caution. The yellow signal indicates caution, and that the next signal will be red. And a red means stop, otherwise known as danger. It's prohibited to pass a signal at danger. The British rail network was originally controlled by thousands of manned signal boxes located at regular intervals along the lines. ♪ guitar background music ♪ (Stewart) My name's Stewart Sentence, I'm the signaller at Uttoxeter signal box. This is the most traditional form of system on the railway as it is at the moment. A lot of this, as you see, goes back to when the original railway started. As far as we're concerned the universe begins at Caverswall over to the right and Sudbury there and we're in the middle. This set of blocks tells me where the train is between myself and Caverswall, and this set of blocks tell me where the train is between Sudbury and myself. These levers here will operate the points for the crossings into the loops and sidings. They'll also work the semaphore signals. (Narrator) To prevent a collision caused by human error, the safety system called "interlocking" protects the railway network. Interlocking is a series of mechanical devices that prevents the signaller operating appliances in an unsafe sequence. (Stewart) What you have here is what looks like a simple lever system but is actually, if you looked underneath the box, is quite a complicated interlocking system. The interlocking system prevents me giving a green signal to an approaching train unless I set that route in that interlocking system safely first. It sounds simple and it basically works simple but the action what it does is very good. (Narrator) Level frame signal boxes, while effective, aren't efficient. They only cover a short section of line and manning them with skilled operators is expensive. (Stewart) Now I can pull the signals off No. 2. [loud click] Some of these you'll see me pulling quite 'ard; that's because there's a lot of gape on these. Some people can't actually pull 'em at all. Well a lot of it's fairly hands on. You see the trains, you've got control over the trains and the job itself. It's a good job; a better job as I've ever 'ad. Without a doubt. [clank] [train passes rapidly] (Narrator) The next big leap in rail signalling control came with the electronic age and the advent of Power Signal control Boxes like this one in Derby. ♪ 60s electronic background music ♪ (Signaller) This location opened in 1969, and when it did open it represented a massive step forward to the railways in the way that trains are signalled. Well, these lines represent mainly the Derby to Birmingham main lines. This signal box actually took over 84 mechanical signal boxes, making it a far more efficient way of carrying out signalling. (Narrator) Routes are set by pressing buttons on a large control panel. Each section between buttons represents a stretch of line formerly controlled by a lever framed signal box. (Signaller) It's very easy to work around. The signalling system is very user friendly and very easy to see the layout of the trains and where they're coming from and going to. The presence of a train is indicated by these red lights on the panel. They're activated by the completion of an electrical circuit when the train's wheels pass over the track circuit. The operation of the signalling equipment is carried out by pulling and pushing the actual buttons that are set in the panel. To set a route you press the entrance button, you press the exit button and the signalling system between detects all equipment that's located between the two signals. Once that's in the correct position, the signal will clear for the train to proceed. To take the route out, we simply pull the exit button and the route will drop out. (Narrator) Power Signal Boxes are regulated by a relay room, a little like a giant mechanical computer. (Signaller) This is the interlocking room, underneath the operating floor of the Power Signal Box. And in 'ere are all the banks of relays. And these relays relay all of the information from the touches of the buttons upstairs from the signaller outside to the points and the track circuits and the level crossings. (Narrator) Relays are interlocking electro-mechanical switches. When the signaller sets a route in the upstairs control room, you can hear the switches clicking, working out how to set the signals and switches and crossings and whether the set route is safe. [clicking] (Signaller) These cabinets are where the equipment in Derby PSB reach the modern era. These allow transmission of the train head code, the four-digit running number that we saw on the panels upstairs to be transmitted to adjacent signal boxes to give them advanced notification of that train coming so that train can be routed further down the line. (Narrator) Powered Signal Boxes are effective and safe. But at Network Rail we're now introducing an even more efficient form of signalling control. ♪ rapid piano background music ♪ (Jason) Compared to the oldest lever box signal boxes, this is a world apart. It's like an Air Traffic Control Centre basically, but controlling trains instead of aeroplanes. My name's Jason Jones, I'm a signaller and I work at Ashford IECC in Kent. The IECC stands for "Integrated Electronic Control Centre". All the signalling in this signalling centre is controlled by computers. A timetable is downloaded every day and any alterations etc. are all programmed into the computer. When everything's running on-time and all the trains are in their correct place and there's nothing else going on, the computers are all running the job and I am literally just sitting here monitoring. Hello John, yeah it's sitting on area 83 Ashford, over. At any time there could be an emergency of any description and that's when I will then step in and take over from the computer. I will turn the computer off and then run the trains manually using the keyboard or the tracker-ball system that we've got. On this screen here I can see the exact layout of the stations and the tracks. I can see where the trains are - where the red line is. Each red line indicates the location of the train. I can see where the trains are heading for (what route they're taking) by the white line. That's what the computer has set up for that train to use. We can also see the signals what the driver sees out on the track. The red dots indicate a signal that's red, we've got a single yellow, we've also got a double yellow. And obviously we've got the green signals which means then he can proceed at line speed. ♪ slower piano background music ♪ The computers that Network Rail uses in this type of location are specifically designed for this type of system. They use various safety protocols, various fail-safes. You get three computers working in tandem with one another and before any decisions are made, two of the computers have to agree with one another. Ashford covers a huge area, right from the Kent coast at Folkstone right the way into Central London. That is the equivalent, yeah, of hundreds of the old style lever frame signal boxes. [train horn] We don't just deal with standard trains here. As well as the commuter trains that we run we also run the high-speed trains into St. Pancras and the Eurostar trains that come from Paris and Brussels. The high speed trains are run using a totally different way of signalling trains than the old-style and conventional signals. The high-speed line is signalled using cab-signalling where the driver gets a display in the cab and that tells him when to stop his train, start his train and what speed he must run at. The trains travel up to 186 mph, and that's just too fast for the driver to be able to see signals out on the track. All the systems, whether you're in a lever box or you're in this type of modern technology it's all designed to fail safe and that is any failures, the signals go back to red. This job carries a lot of responsibility. You are responsible for people's lives on the trains, the public, drivers, track workers. You do have a fair bit of responsibility. No matter how much the technology changes, the one thing that remains the same is the safety and the security of the trains out on the track.

Implementation

Urban

Moving block is in use on several London Underground lines, including the Victoria,[citation needed] Jubilee, and Northern lines, and parts of the sub-surface lines.[2] In London it is also used on the Docklands Light Railway[3] and the core section of the Elizabeth line.[4] New York City Subway's BMT Canarsie Line (L train), Tren Urbano (Puerto Rico),[5] Singapore's MRT, and Vancouver's SkyTrain, also employ moving block signalling. It is also used by the Hong Kong MTR, on the Tuen Ma line, Disneyland Resort line, South Island line and the East Rail line .[6]

Inter-city

It was supposed to be the enabling technology on the modernisation of Britain's West Coast Main Line which would allow trains to run at a higher maximum speed (140 mph or 230 km/h), but the technology was deemed not mature enough, considering the large number of junctions on the line, and the plan was dropped.[7] It forms part of the European Rail Traffic Management System's level-3 specification for future installation in the European Train Control System, which will at level 3 feature moving blocks that allow trains to follow each other at exact braking distances.

References

  1. ^ "Moving Block — The Theory". ATP Beacons and Moving Block. Railway Technical Web Pages. 17 November 2016. Archived from the original on 9 February 2009. Retrieved 17 November 2016.
  2. ^ White, Steve; Abbott, James (2017-10-26). "Sub-surface transformation". Modern Railways. Retrieved 2022-07-24.
  3. ^ Lockyear, M.J. (1998). "The application of a transmission based moving block automatic train control system on Docklands Light Railway". International Conference on Developments in Mass Transit Systems. Vol. 1998. London, UK: IEE. pp. 51–61. doi:10.1049/cp:19980097. ISBN 978-0-85296-703-4.
  4. ^ "Signalling and Testing on the Elizabeth line" (PDF). Crossrail. November 2019. Retrieved 24 July 2022.
  5. ^ "Tren Urbano - Railway Technology".
  6. ^ "The Jubilee Line Upgrade" (PDF). London Underground Railway Society. 13 October 2009. Retrieved 22 November 2009.
  7. ^ "Background to the West Coast Modernisation Programme — The West Coast Route Modernisation began as a private sector programme" (PDF). The Modernisation of the West Coast Main Line. Comptroller and Auditor General, National Audit Office. 22 November 2006. p. 26. Archived (PDF) from the original on 26 November 2016. Retrieved 26 November 2016.
This page was last edited on 18 September 2023, at 07:14
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.