To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Mill Creek Wind Farm

From Wikipedia, the free encyclopedia

Mill Creek Wind Farm
Map
CountryNew Zealand
Locationwest of Johnsonville, Wellington
Coordinates41°12′44″S 174°44′20″E / 41.21222°S 174.73889°E / -41.21222; 174.73889
StatusOperational
Construction beganAugust 2012
Commission datemid-2014
Owner(s)Meridian Energy
Wind farm
TypeOnshore
Rotor diameter82.4 m (270 ft)
Power generation
Units operational26
Make and modelSiemens Wind Power: SWT-2.3-82 VS
Nameplate capacity59.8 MW

Mill Creek Wind Farm is a wind farm in the Ohariu Valley near Wellington, New Zealand.[1]

The wind farm is operated by Meridian Energy and has 26 wind turbines. [2]

The application for resource consents described the project as having a total capacity of up to 71.3MW.[3][4][5] The wind farm covers an area of approximately 18 square kilometres (7 sq mi) and was planned to use 31 Siemens 2.3MW wind turbines.[4] A 33,000-volt power line connects the wind farm to Transpower's Wilton substation, where the farm's electricity is injected into both Wellington Electricity's local distribution network and the national grid.

The resource consents were granted in February 2009[6] with conditions, including a limit of 29 turbines and a maximum height of 111 m (364 ft). Local Ohariu Valley residents who opposed the development lodged an appeal to the Environment Court.[7] In August 2011, the Environment Court approved the resource consents for the project, subject to a limit of 26 turbines.[8]

Construction began in late 2012, and the first electricity was generated in May 2014.[9] It became fully operational in October 2014. [10]

YouTube Encyclopedic

  • 1/2
    Views:
    10 163
    756
  • Construction of Xcel Energy's Courtenay Wind Farm
  • Texas wind farmer sees easy coexistence

Transcription

See also

References

  1. ^ "Wind Farms". Wellington City Council. Archived from the original on 6 September 2008. Retrieved 21 September 2008.
  2. ^ "Meridian's new windfarm open". Dominion-Post. 8 January 2015. Retrieved 14 August 2015.
  3. ^ Kay Blundell (30 January 2008). "Turbine farm for Ohariu Valley". The Dominion Post. Retrieved 21 September 2008.
  4. ^ a b Rachel Pawson & Lisa Hayes (30 July 2008). "Report to the Resource Consents Hearing Committee" (PDF). Wellington City Council. Retrieved 21 September 2008.
  5. ^ "Notified Resource Consent". Wellington City Council. Archived from the original on October 14, 2008. Retrieved 4 March 2009.
  6. ^ "Mill Creek Wind Farm Decision Released". Wellington City Council. 18 February 2009. Retrieved 18 February 2009.
  7. ^ NZPA (19 February 2009). "Wellington's second wind farm gets go-ahead". New Zealand Herald. Retrieved 19 February 2009.
  8. ^ "Ohariu Valley wind farm approval irks opponents". Dominion-Post. 17 August 2011. Retrieved 17 August 2011.
  9. ^ "Meridian Energy: Blowing in the wind". New Zealand Herald. 1 September 2014. Retrieved 12 September 2014.
  10. ^ "Mill Creek Wind Farm". Higgins Group Holdings Limited. Retrieved 14 August 2015.

External links

This page was last edited on 23 June 2021, at 00:03
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.