To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Mesochora Dam
Spillway of Mesochora Dam
Location of Mesochora Dam in Greece
CountryGreece
LocationMesochora, Trikala
Coordinates39°27′51.86″N 21°18′15.08″E / 39.4644056°N 21.3041889°E / 39.4644056; 21.3041889
PurposeRiver diversion, irrigation, power
StatusComplete, not commissioned
Construction began1996
Opening date2001
Owner(s)Public Power Corporation of Greece
Dam and spillways
Type of damEmbankment, earth-fill
ImpoundsAcheloos River
Height150 m (490 ft)
Length340 m (1,120 ft)
Dam volume5,000,000 m3 (6,500,000 cu yd)[1]
Reservoir
Total capacity358,000,000 m3 (290,000 acre⋅ft)
Surface area7.8 km2 (3.0 sq mi)
Power Station
TypeConventional
Turbines2 x 81 MW Francis-type (planned)
Installed capacity162 MW (planned)

The Mesochora Dam is concrete-face rock-fill dam on the Acheloos River near Mesochora in Trikala, Greece. The 150 m (490 ft) tall dam is part of the Acheloos River Diversion which is intended to divert a portion of the Acheloos west to irrigate 240,000–380,000 ha (590,000–940,000 acres) in the Thessaly plains. The project includes the Mesochora, Sykia, Mouzaki and Pyli Dams along with a 17.4 km (10.8 mi) long channel.

The idea for an Acheloos to Thessaly diversion project was first envisioned in the 1930s but a lack of funding precluded construction. Interest in the project was revived in 1984 and what was supposed to be a small dam at Mesochora apart from the diversion project was increased in size to support to river diversion. Over the next several years there was a series of legal battles that led to construction stalling, most recently in 2005.[2] Opponents of the scheme cite significant changes to the environment, flooding of villages and that the scheme will divert 600,000,000 m3 (490,000 acre⋅ft) of water annually from the Acheloos. Supporters call on the benefit to the lucrative cotton crops it will help irrigate and the dam's planned 162 MW hydroelectric power plant.[3] The Mesochora Dam was completed in January 2001 but the reservoir has yet to be filled and the power plant has subsequently not been commissioned due to legal battles.[4]

See also

References

  1. ^ "Large Dams in Greece". Greek Commission on Large Dams. Archived from the original on 21 March 2012. Retrieved 30 April 2013.
  2. ^ "Large Dams in Greece". National Technical University of Athens. Archived from the original on 4 November 2013. Retrieved 30 April 2013.
  3. ^ "Acheloos River Diversion Project, Greece, Greece". Water Technology. Archived from the original on 18 June 2017. Retrieved 30 April 2013.
  4. ^ "Hydroelectric Plants in Greece - Macedonia". IndustCards. Retrieved 30 April 2013.

External links

Media related to Mesochora Dam at Wikimedia Commons

This page was last edited on 1 April 2020, at 04:16
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.