To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Melocheville Tunnel

From Wikipedia, the free encyclopedia

The Melocheville Tunnel is a tunnel connecting Beauharnois and Melocheville in Quebec, Canada. It is a segment of Route 132 located near the Beauharnois generating station. The tunnel measures 227.6 m (747 ft) m. Until 1991, it was called the Beauharnois Tunnel.[1]

History

Construction

The construction of the tunnel was carried out as part of the construction of the Beauharnois Canal, between 1956 and 1957.[2]

The tunnel consists of 18 caissons, placed directly on the rock, one lane in each direction, one sidewalk on the north side and three ventilation shafts, one of which is used for the air outlet and two others for the air inlet.[3]

The tunnel passes under the Beauharnois Canal in Melocheville and is an integral part of the St. Lawrence Seaway.

Improvements

In 1968, work was carried out for tunnel rehabilitation and resurfacing.

Since then, maintenance work such as road repairs, repair of tunnel walls and rehabilitation of approaches have been carried out to ensure a safe and efficient passage for users and preserve the integrity of the structure.

Circulation

In the tunnel, the two traffic directions are separated by a central support structure forming the first ventilation shaft (air outlet). The tunnel also has a sidewalk on the north side. Nearly 1.7 million passages[4] are made in this tunnel each year.

Administration

Since October 1, 1998, the operation, maintenance and administration of the tunnel belong to Jacques Cartier and Champlain Bridges Incorporated (JCCBI). The structure was previously under the authority of the St. Lawrence Seaway Authority.[5]

References

  1. ^ "Melocheville tunnel ⋆ PJCCI". PJCCI. Retrieved 2018-03-12.
  2. ^ "St. Lawrence Seaway Management Corporation and Melocheville Tunnel". PJCCI. 2017-04-27. Retrieved 2018-03-12.
  3. ^ "Melocheville Tunnel Technical Data Sheet" (PDF). jacquescartierchamplain.ca. Retrieved May 14, 2018.
  4. ^ "A tunnel still also young, even 60 years later! ⋆ PJCCI". PJCCI. 2017-09-23. Retrieved 2018-03-12.
  5. ^ "About ⋆ PJCCI". PJCCI. Retrieved 2018-03-12.

External links

45°18′50″N 73°55′14″W / 45.314°N 73.9205°W / 45.314; -73.9205


This page was last edited on 12 April 2023, at 23:05
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.