To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Main One
Owners:
Main Street Technologies
Key people:
Funke Opeke
Landing points
Total length14,000 km
Topologytrunk and branch
Design capacity1280 Gbit/s
Currently lit capacityn/a
TechnologyFiber optics
Date of first useJuly 22, 2010; 13 years ago (July 22, 2010)

The Main One Cable is a submarine communications cable stretching from Portugal to South Africa with landings along the route in various west African countries. On April 28, 2008, it was announced that Main Street Technologies has awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications.

The cable system spans 14,000 km and provides additional capacity for international and Internet connectivity to countries between Portugal and South Africa on the west coast of Africa. The submarine cable project was designed in two phases, both of which were scheduled for completion in May 2010. The dual fiber pair, 1.28-Tbit/s, DWDM project connects Nigeria, Ghana, and Portugal in Phase 1 with onward connectivity through Portugal to Europe, Asia and the Americas. The Phase 1 cable system spans 6,900 kilometres. Additional connectivity extending to Angola and South Africa occurred in the second phase of the project.

Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity. The system is being developed by Main Street Technologies headquartered in Lagos. An October 10, 2008 press release states that the desk top study and engineering for the system has been completed. On July 22, 2010, the cable was launched. MainOne also owns a data centre subsidiary, MDXi which builds and operates Tier III data centres across West Africa.

Project management and engineering for the cable system has been contracted to specialist undersea consulting firm, Pioneer Consulting.[1]

The Chief Executive Officer of Main One is Funke Opeke.

YouTube Encyclopedic

  • 1/3
    Views:
    61 108
    5 671 120
    628 343
  • Telecommunications 01/10 - Introduction structure regulation and competition in the telecom sector
  • How does your mobile phone work? | ICT #1
  • How Cell Towers Work: Hands-On!

Transcription

Path

Main One - phase 1

The Main One Cable is an undersea cable system stretching from Portugal to South Africa with landings along the route in various west African countries.

Landing points

The Main One cable system has the following landing points in operation in July 2010:[2]

planned landing points for phase 2 are:

Impact

Main One provides international capacity into a region that has experienced explosive growth in tele-density in recent years, but which remains constrained with respect to access to international cable capacity for global connectivity.

The Main One Cable system provides open access to regional telecom operators and Internet service providers at rates that are less than 20% of current international bandwidth prices in the region available via SAT3 or satellite service providers, according to the project's organizers. Main Street says it will encourage local content development via skills transfer of critical networking technologies and job creation with the location of the network operational center (NOC) for the entire system in Nigeria.[3]

Ownership

The cable is privately owned by Main Street Technologies, international investors like the Africa Finance Corporation and the Pan-African Infrastructure Development Fund (PAIDF) and a couple of Nigerian banks.

Acquisition

Equinix announced they will be acquiring Mainone for an enterprise value of $320m, the deal is expected to be completed in the first quarter of 2022.

Construction time-line

On April 28, 2008, it was announced that Main Street Technologies had awarded a turnkey supply contract for the Main One Cable System to Tyco Telecommunications.[4] An October 10, 2008 press release states that the desk top study and engineering for the system had been completed.[5] On July 1, 2010, press release states that Main One had been completed and commissioned.[6] The cable went live on July 22, 2010.[7]

See also

Individual cable systems off the west coast of Africa include:

Footnotes

  1. ^ "Pioneer Consulting awarded MainOne contract", Ghana Business News
  2. ^ MainOne cable company Project Room Archived 2010-09-24 at the Wayback Machine
  3. ^ "Home". mainonecable.com.
  4. ^ http://lw.pennnet.com/display_article/327046/13/ARCHI/none/NNEWS/1/Tyco-awarded-Main-One-cable-contract/
  5. ^ http://lw.pennnet.com/display_article/342314/13/ARTCL/none/none/1/Main-One-Cable-System-progressing-on-schedule/
  6. ^ "Untitled Document". Archived from the original on 2010-09-25. Retrieved 2010-07-05.
  7. ^ "allAfrica.com: Nigeria: MainOne Fibre Optic Cable Launched". Archived from the original on 2010-07-25.

Sources

This page was last edited on 12 October 2023, at 09:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.