To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Maa Flyover over JBS Haldane Avenue
Maa flyover near Science City

Maa Flyover (Bengali: মা উড়ালপুল; also known as Parama Island Flyover) is a 7.50 kilometres (4.66 mi) long flyover in Kolkata, West Bengal, India.[1] It is built along Park Circus Connector and connects EM Bypass with Park Circus 7-Point Crossing. After both ramps of the flyover connecting it with AJC Bose Road Flyover were completed in early 2019, the flyover forms a seamless, no-signal traffic corridor from EM Bypass to PG Hospital. The total length of the flyover, including the ramps, is 9.2 km and is the fourth longest flyover in the entire country. The flyover started its construction in February 2010. The project had an original deadline of August 2012, and the deadline was extended multiple times.[2] After a huge cost-overrun and delays, the main flyover was opened on 9 October 2015 at a cost of 460 crores.[3][4][5] The 450-metre east bound flank of the flyover, which directly connects AJC Bose Road Flyover with the flyover from Exide Side to EM Bypass, was opened in August 2016[6] while the west bound flank of the flyover connecting it to AJC Bose Road Flyover was opened in February 2019.[7] Barring a stretch of 684.31 metres constructed by Larsen & Toubro, the flyover was constructed by Hindustan Construction Company.[6]

View of Forum Atmosphere from Maa Flyover
Maa Flyover Night View

Route timings and restrictions

The flyover which was opened without completion of the flanks connecting AJC Bose Road Flyover, resulted in massive traffic jams after initial inauguration. With the pressure mounting Kolkata Police was forced to temporarily shut down the flyover for few hours.[8] After initial discussion, Kolkata Police devised a solution allowing only one-way traffic (during certain time of the day) as an interim solution until the connecting flanks were completed.[9][10]

Maa Flyover View From Park Circus 7-Point

Timings from 27 October 2015 to August 2016:[11]

  • Whole Day — Both ways Open.
  • From 10 pm to 6 am — Two Wheeler Not Allowed

The flyover is also closed for heavy vehicles including buses and trucks, auto-rickshaws and pedestrian traffic.[12]

Maa Flyover above Park Circus 4 no Railway Overbridge

From 9 February 2019, after the inauguration of the flank from Maa Flyover to AJC Bose Road Flyover, traffic moves both ways with other restrictions still in law. It now directly connects from Science City to Victoria Memorial.[7]

References

  1. ^ Roy, Subhajoy (13 October 2015). "Ma for Manush to fly over Mati". The Telegraph. Archived from the original on 15 October 2015. Retrieved 22 October 2015.
  2. ^ Roy, Subhajoy (7 March 2014). "Flyover in limbo as jilted firm drags govt to court". The Telegraph. Archived from the original on 11 March 2014. Retrieved 1 October 2015.
  3. ^ "High fives for longest flyover". 10 October 2015. Retrieved 22 October 2015.
  4. ^ "Kolkata to get state's longest flyover linking Howrah with EM Bypass". 7 October 2015. Retrieved 7 October 2015.
  5. ^ "West Bengal eyes Mahalaya for Parama flyover opening". Times of India. TNN. 14 July 2015. Retrieved 28 September 2015.
  6. ^ a b Basu, Kinksuk (28 September 2015). "Firm seeks two roads for flyover work". The Telegraph. Archived from the original on 1 October 2015. Retrieved 1 October 2015.
  7. ^ Mehta, Pooja (10 October 2015). "Parama Island flyover in Kolakata shuts down temporarily". DNA. Archived from the original on 12 October 2015. Retrieved 22 October 2015.{{cite news}}: CS1 maint: unfit URL (link)
  8. ^ Basu, Kinksuk (15 October 2015). "Snarl shields scrapped". The Telegraph. Archived from the original on 16 October 2015. Retrieved 22 October 2015.
  9. ^ "One-way rule to ease flyover jam". Times of India. 14 October 2015. Retrieved 22 October 2015.[dead link]
  10. ^ "Parama traffic plan tweaked". The Telegraph. 28 October 2015. Archived from the original on 28 October 2015. Retrieved 29 October 2015.
  11. ^ Chakraborty, Ajanta (7 October 2015). "Bypass flyover off limits to bus, truck". The Times of India. Retrieved 22 October 2015.

This page was last edited on 23 December 2023, at 13:02
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.