To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Lotru-Ciunget Hydroelectric Power Station

From Wikipedia, the free encyclopedia

Lotru-Ciunget Dam
Lotru-Ciunget Dam is located in Romania
Lotru-Ciunget Dam
Lotru-Ciunget Dam
Locationvillage Ciungetu; commune Mălaia
Coordinates45°26′50″N 23°46′06″E / 45.44721°N 23.76834°E / 45.44721; 23.76834
Typereservoir
Primary inflowsLotru
Primary outflowsLotru
Basin countriesRomania
Surface area12 km2 (4.6 sq mi)
Water volume340 million cubic metres (280,000 acre⋅ft)

Lotru-Ciunget Dam and Hydro Power Plant is a large hydroelectric complex on the river Lotru situated in Romania and one of the biggest complex facilities in Europe. The complex consists of three hydroelectric power plants. The first and most productive one is Ciunget, the second one is Malaia and the third is Bradisor which, just as Ciunget, is an underground power plant.

The river which fills the dams is called Lotru. The first dam is called Vidra Lake and is one of the biggest artificial lakes in Romania. The dam supplies water to the Ciunget power plant via an 800-metre drop penstock. All the used water is recollected via an underground piping system and flows to the Malaia dam where is the second power plant. Malaia dam is a smaller dam and produces less electricity, mainly locally. From the second dam, the used water collects into the Bradisor dam. The Bradisor dam has a bigger capability of producing electricity than the Malaia dam and provides electricity to the Romanian national grid. Bradisor power plant is situated under a mountain in order to make the fall of water greater, thus more electricity.

The project was started in 1965, being fully finished only in 1982 and it was made up by the construction of a rockfill with a clay core dam 140 m high and an underground power plant equipped with three hydrounits, having an installed capacity of 510 MW. The Pelton type turbines operate under a net head of about 800 m. A 220 kV outdoor substation connects the plant to the Romanian electric grid.

The Ciunget hydro power plant entered revision and modernisation in 2007. This includes new generators to increase the electricity outflow. The modernisation period is expected to be finished in late 2010.[needs update]

The power plant generates 1.15 TW·h (billion kW·h) of electricity per year.

YouTube Encyclopedic

  • 1/2
    Views:
    1 542
    14 789
  • VIDEO Arhivă: Construcția de hidrocentrale în România HD
  • Microhidrocentrale Com. Farcasa Jud. Neamt.

Transcription

See also

External links


This page was last edited on 20 January 2024, at 10:20
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.