To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Livraga derailment

From Wikipedia, the free encyclopedia

Livraga derailment
Photograph of a Frecciarossa 100 train set similar to the one involved
A Frecciarossa 1000 trainset identical to the one involved.
Map
Details
Date6 February 2020
LocationLivraga, Lombardy
Coordinates45°11′20″N 9°34′02″E / 45.188820°N 9.567314°E / 45.188820; 9.567314
CountryItaly
LineMilan–Bologna high-speed railway
OperatorTrenitalia
ServiceMilan-Salerno
Incident typeDerailment
CauseIncorrect switch position
Statistics
Trains1
Passengers28
Crew5
Deaths2
Injured31

The Livraga derailment is the only railway accident to date on the Italian high speed rail network.[1] It took place on 6 February 2020 when a high-speed train derailed at Livraga, Lombardy, Italy. Two people died and 31 were injured.

Derailment

Train 9595 was the first southbound service of any day in Italy's high speed railways, scheduled to start from Milan at 5:10 and to arrive in Salerno at 11:27.[2] On 6 February 2020, the train, run by Frecciarossa 1000 trainset no. 21, entered the Milan-Bologna high-speed railway and reached its top speed as usual. Not long after departure it reached the "posto di movimento Livraga", a site equipped with passing loops where RFI maintenance vehicles are parked named after the nearby town of Livraga.

For reasons under investigation, on that morning point number 5 (which connects the main line to the passing loop) was unknowingly in diverted position.[3] At 05:34 local time (04:34 UTC),[4][5][6] upon passing on point number 5, the train was unexpectedly diverted to the passing loop; since the train was travelling at about 300 km/h (190 mph), while the point was designed to be traversed in diverted position at no more than 100 km/h (62 mph), the train suddenly derailed.

The coupling between coach 1 and 2 broke; the first coach spun round through 180 degrees, collided with some maintenance vehicles, and finally came to rest overturned near a railway building[7] (one of whose walls was destroyed by the coach's bogie, which had detached). The remaining seven coaches, instead, remained upright and kept going straight with their wheels on the track ballast, until they stopped after a few hundred meters.

Of the 33 people on the train: five staff and 28 passengers, only the two drivers died.[8][7] [9]

Two people were seriously injured.[10] Railway workers in Italy called a two-hour strike starting at midday, 7 February 2020.[6]

Investigation

An investigation into the derailment was opened.[7] The Agenzia Nazionale per la Sicurezza delle Ferrovie is responsible for investigating railway accidents in Italy.

Point number five[clarification needed] had been replaced the day before the crash.[6]

Investigators reported that the accident was caused by a set of junction points being in the reverse position but were reported to the signalling system as in the normal – i.e. straight – position. Maintenance works occurred that night, and as a consequence of the inspection, points were found faulty.

Unable to replace them overnight, maintenance workers followed a temporary override procedure, which is allowed to take place in these exceptional circumstances.

Maintenance workers claimed that they manually placed the faulty point to the straight position, but disconnected its network connection and its link to the safety signalling system (ETCS L2) because of their faulty status.

As normal part of such procedure, workers reported (according to evidence) that the point had been forcibly put in the straight position and taken offline. The signalling system used this information to report no anomalies on the line, and as a consequence the train was not commanded to reduce speed.

Under normal circumstances (i.e. if the junction was really straight), all services on the line could have continued their journeys at full speed. In this case, the first train on schedule hit the junction at 292km/h causing the derailment.[11]

On 13 February, the head of rail transport security agency ANSF stated that faulty cabling in switching equipment supplied by Alstom may have been a factor in the accident.[12] All 11 points owned by RFI and produced within the same lot were put out of order.[13]

References

  1. ^ "Treno deragliato a Lodi, in che stato di salute è l'alta velocità in Italia?". Open (in Italian). 7 February 2020. Retrieved 17 October 2020.
  2. ^ "Orario treno FRECCIAROSSA 9595 di TRENITALIA Lunga Percorrenza da MILANO CENTRALE a SALERNO - www.e656.net". 13 February 2020. Archived from the original on 13 February 2020. Retrieved 17 October 2020.
  3. ^ "Treno deragliato, polfer indaga su scambio trovato aperto". Adnkronos. Retrieved 17 October 2020.
  4. ^ "Deraglia un Frecciarossa nel lodigiano: centinaia i soccorritori sul posto" [A Frecciarossa in the Lodi area derails: hundreds of rescuers on site]. Ministero dell'interno (in Italian). 6 February 2020. Retrieved 7 February 2020.
  5. ^ "Incidente sulla linea Alta Velocità Milano – Bologna" [Accident on the Milan – Bologna high-speed line] (in Italian). Gruppo FS Italiane. FS News. Retrieved 7 February 2020.
  6. ^ a b c Pisa, Massimo; Rancati, Mauro; Visetti, Giampaolo (6 February 2020). "Deraglia treno alta velocità a Lodi, morti i due macchinisti. Ci sono 31 feriti. Ieri sostituito un deviatoio" [High speed train derailment in Lodi, the two train drivers died. There are 31 injured. Yesterday replaced a turnout] (in Italian). La Repubblica. Retrieved 6 February 2020.
  7. ^ a b c "Italy train crash: Two dead in high-speed derailment". BBC News. 6 February 2020. Retrieved 6 February 2020.
  8. ^ "Milan train crash: Two dead and more than 20 injured after high-speed train derails". The Independent. Retrieved 6 February 2020.
  9. ^ "High-speed train derails, drivers killed, 31 hurt". ANSA. 6 February 2020. Retrieved 6 February 2020.
  10. ^ "Two dead and 27 injured as high-speed train derails in Italy". Sky News. Retrieved 6 February 2020.
  11. ^ "Treno deragliato, le cause dell'incidente: «Uno scambio aperto per errore»" [Train derailed, the causes of the accident: «A set of points opened by mistake»] (in Italian). Corriere. 7 February 2020. Retrieved 8 February 2020.
  12. ^ "Alstom executive investigated over Italian train crash". Reuters World News. 14 February 2020. Retrieved 23 February 2020.
  13. ^ "Deragliamento di Lodi: ritrovato l'undicesimo scambio. Fa parte del lotto incriminato, ma mancava all'appello". la Repubblica (in Italian). 15 February 2020. Retrieved 17 October 2020.
This page was last edited on 7 April 2024, at 20:01
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.