To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Line 6 (Montreal Metro)

From Wikipedia, the free encyclopedia

Metro lines and proposed extensions in 1984

Line 6 was a proposed surface-running line of the Montreal Metro. Unlike the rubber-tire technology used on the Metro's current lines, Line 6's trains would have run on steel wheels. Planned as the first of a series of new "regional metro" lines along existing railways in 1979 (similar in concept to the Paris RER and San Francisco BART), the Ministère de Transport du Québec (MTQ) expected Line 6 to begin service along 23.3 km of Canadian National railway tracks by 1989. According to a MTQ proposal from 1982, Line 6 would have intersected the Orange Line (Line 2) at Du College and Sauve stations, and along with a planned transfer with the also-unbuilt Red Line, or Line 3, the line would have had 11 stations overall. Running along the northern part of the island, it would have passed through the districts of St. Laurent, Ahuntsic, Saint-Michel, Montreal-Nord, Riviere-des-Prairies and Pointe-aux-Trembles.[1] Planned stations included elevated stops along viaducts, and others at ground level.

According to the MTQ, trains would have run every five minutes during rush hour and every fifteen minutes the rest of the day, at a top speed of 120 km/h (75 mph), approximately twice that of the underground Metro lines. Trains would have run in four-car sets during rush hour, and two cars the rest of the day.

Due to an economic slowdown in Montreal, the Line 6 proposal was abandoned in 1985. Unlike the unbuilt Lines 3 (Red) and 7 (White), Line 6 never advanced far enough in the planning process to receive a colour.[citation needed] The Mascouche line of the Réseau de transport métropolitain (RTM), opened in 2014, follows a similar route to the eastern portion of Line 6.

YouTube Encyclopedic

  • 1/3
    Views:
    8 760
    951
    14 614
  • Montreal Metro-Station Cartier
  • Montreal Metro-Train 79-707 Orange Line(Montmorency to De la Concorde)
  • Metro Montreal at Berri-UQAM

Transcription

List of planned stations

The following stations were planned for the line:[1]

References

  1. ^ a b "Le Métro fait surface: La ligne 6". Quebec Science, vol. 21, no. 3, Nov. 1982. Ministere des Transports du Quebec and le Conseil des Transports de la region de Montreal.
This page was last edited on 23 July 2022, at 19:36
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.