To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Line 30 (Chengdu Metro)

From Wikipedia, the free encyclopedia

Chengdu Metro Line 30
30
Overview
StatusConstruction
OwnerCity of Chengdu
LocaleChengdu, Sichuan
Termini
  • Terminal 2 of Shuangliu International Airport East[1]
  • Longquan Railway Station[2]
Stations24[2]
Service
TypeRapid transit
SystemChengdu Metro
Operator(s)Chengdu Metro Corporation
Depot(s)Gaobeiba Depot (高碑坝车辆段)
Hongjiaqiao Depot (洪家桥停车场)
History
Planned opening2024
Technical
Line length27.74 km (17.2 mi)[2]
Number of tracks2
Characterunderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Electrificationoverhead lines, 1,500 V DC
Operating speed80km/h

Line 30 of the Chengdu Metro is a metro line currently under construction in Chengdu. Line 30's color is Light Pink. Phase 1 runs tangentially on the south side of the Chengdu from Terminal 2 of Shuangliu International Airport East[1] to Longquan Railway Station.[2] Phase 1 is 27.74 km long with 24 stations, all underground.[2] Line 30 will use 6-car Type-B rolling stock operating up to 80 km/h.[3] Line 30 will be served by two depots at Gaobeiba and Hongjiaqiao.[3]

YouTube Encyclopedic

  • 1/5
    Views:
    1 228
    79 465
    1 454
    8 856
    2 277 590
  • World Metro Systems: Chengdu Metro
  • Watch: This train passes through residential building in China!
  • China: Chengdu - Metro (underground) - buying ticket
  • 规划上百年,总投资3000亿,中国为什么一定要建设川藏铁路?China spent $300 billion building a railway
  • The Unstoppable Growth of China's High-Speed Rail Network

Transcription

History

  • On March 18, 2020, construction started on Line 8 Phase 2, Line 19 Phase 2, Line 27 Phase 1, and Line 30 Phase 1.[4]
  • In Dec 2022, Phase 1 finished Financial City North's water/cable/pipe reroute, marking station's main structure construction enters next stage.[6]
  • On Dec 22 2022, Phase 1 finished Jiaozi Flyover's structure construction.[7]
  • On 17 Feb 2023, Phase 1 Terminal 2 of Shuangliu International Airport East~Sisheng section's left tunnel is finished, marking the completion of the 18th tunnel.[8]
  • On 31 March 2023, Phase 1 's Gaobeiba Depot (高碑坝车辆段) is powered on.[9]
  • On 11日 September 2023, Phase 1's longest station - Terminal 2 of Shuangliu International Airport East finished structure construction, marking the 23rd station to finish structure contraction.[10]
  • On 22 September 2023, Phase 1 finished tunnel construction.[11]

Stations

Station name Transfer Distance
km
Location
English Chinese
Terminal 2 of Shuangliu International Airport East[1] 双流机场2航站楼东 19 0.00 0.00 Shuangliu
Sisheng 寺圣 2.09 2.09
Xingyue 星月 0.81 2.90
Guangming 光明 0.92 3.82
Xiejiadu 谢家渡 1.31 4.13
Zhujiang Road 珠江路 8 0.66 5.79
Datong 大同 1.34 7.13
Shiyang East[1] 石羊东 1.99 9.12 High-Tech Zone
Xinyuan Avenue 新园大道 0.87 9.99
Chengdu First People's Hospital 市一医院 5 1.15 11.14
Yizhou Avenue 益州大道 0.84 11.98
Financial City North 金融城北 0.86 12.84
Fuchengqiao 府城桥 0.61 13.44
Jinshi Road 金石路 6 1.25 14.69 Jinjiang
Juanzishu 棬子树 1.59 16.28
Jinyi 锦逸 0.99 17.27
Jiaozi Flyover 娇子立交 1.70 18.97
Haitong Street 海桐街 0.90 19.87
Hangtian Flyover 航天立交 1.01 20.87
Huiwangling 惠王陵 2 1.07 21.94 Longquanyi
Yushi 玉石 1.37 23.31
Fenshui 分水 1.09 24.40
Yuhong Road[1] 玉虹路
Longquan Railway Station 龙泉

References

  1. ^ a b c d e "关于幸福梅林路等29条道路2座桥梁隧道4座轨道交通站点命名更名的公示". Archived from the original on 2022-12-16. Retrieved 2022-12-16.
  2. ^ a b c d e "轨道交通30号线一期工程". Archived from the original on 2021-11-10. 30号线一期工程,起于双流机场2航站楼站,止于龙泉站。线路全长约27.74km,共设车站24座,全部为地下线
  3. ^ a b "成都轨道交通30号线一期工程 首次环境影响评价信息公开". 成都轨道集团官方网站. Retrieved 2020-02-19.
  4. ^ "刚刚!成都地铁8号线二期、27号一期、30号线一期三线开建!_四川在线". sichuan.scol.com.cn. Retrieved 2020-06-14.
  5. ^ "喜!成都地铁30号线龙泉段开始放线 龙泉驿设置4个站点".
  6. ^ "成都地铁再上新!首个四线换乘车站揭秘" (in Chinese). 2022-12-21.
  7. ^ "「四川全"拼"图」成都地铁30号线娇子立交站顺利封顶" (in Chinese). 2022-12-21.
  8. ^ "地铁19号线二期年内试运营!成都轨交建设最新进展" (in Chinese). 2022-12-21.
  9. ^ "#成都轨道交通建设进展# 30号线一期工程高碑坝车辆段110kV铜牧线顺利完成迁改送电。". weibo.
  10. ^ "成都轨道线路最新进展:已有109座车站封顶 盾构累计掘进占总量的89%" (in Chinese).
  11. ^ "成都地铁30号线一期工程全线洞通" (in Chinese).
This page was last edited on 27 November 2023, at 17:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.