To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Ligerz Tunnel
Model of the future tunnel
Overview
LineJura Foot Line
Operation
Opens2026
Technical
Length2.1 kilometres (1.3 mi)
Track gauge1,435 mm (4 ft 8+12 in)

The Ligerz Tunnel (French: Tunnel de Gléresse) is a railway tunnel under construction at the southern foot of the Jura Railway line in Switzerland. The last single-track section of the southern Jura line is to be eliminated by the double-track tunnel. This bottleneck between the service stations at Chavannes [de] (German: Schafis) and Twann (French: Douanne) on the Biel–Neuchâtel route is currently preventing rail traffic from being densified. The planned costs amount to 431.9 million Swiss francs (470 million US dollars).[1]

The tunnel is part of the STEP 2030 project and should be completed by December 2026. The tunnel will enable a continuous half-hourly service on the line.

It will run on the sea side and largely parallel to the existing road tunnel of Motorway number 5, which forms the Ligerz bypass.

The Twann station is to be modernized. The previous stop Ligerz will be removed and replaced by a bus line. This should open up the village of Ligerz and the Ligerz-Tessenberg railway from Twann, and an extension of the future bus line to La Neuveville is also under discussion.

The construction of the Ligerz Tunnel will be financed by the new Railway Infrastructure Fund (RIF), which Swiss voters accepted on February 9, 2014, with the FABI proposal.

References

  1. ^ Burroughs, David (12 April 2022). "Construction begins on Switzerland's Gléresse tunnel". International Railway Journal. Retrieved 12 April 2022.

External links

This page was last edited on 7 May 2024, at 14:29
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.