To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Levenmouth rail link

From Wikipedia, the free encyclopedia

Levenmouth rail link
Overview
StatusConstruction complete, infrastructure testing
OwnerNetwork Rail
LocaleLevenmouth, Fife, Scotland
Termini
  • Leven
  • Edinburgh
Stations2
Service
TypeHeavy rail
SystemNational Rail
Operator(s)ScotRail
Rolling stockClass 158
Class 170
History
OpenedExpected 2 June 2024
Technical
Number of tracksDouble (except for Thornton Junction)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Route map
Levenmouth rail link
Leven
Cameron Bridge
Diageo plc
Glenrothes with Thornton
Kirkcaldy
Down arrow
Fife Circle Line
to Edinburgh Waverley
Down arrow

The Levenmouth rail link[1] (also called the Leven rail link[2]) is a planned scheme to re-open 5 miles (8 km) of railway line in Fife, Scotland. The link will connect the town of Leven and other settlements in the Levenmouth conurbation with Thornton, and will join the Fife Circle Line at Thornton North Junction. The line is being promoted by Fife Council and the South East Scotland Transport Partnership (SESTRAN).[2][3] The plan was approved by the Scottish Government on 8 August 2019.[4] The project is due to be completed with the railway line opening on 2 June 2024.[5]

History

Methil power station (now demolished) with the disused railway in the foreground

The line first opened as the Leven Railway on 3 July 1854 after receiving parliamentary authorisation in 1852. The line served stations at Cameron Bridge and Leven. The East of Fife Railway merged with the Leven Railway in 1861, forming the Leven and East of Fife Railway. The station at Leven was moved to a new site in 1885, and in 1909 the line was doubled. Freight east of Leven ceased in 1966, bringing a closure of the line up to St Andrews. Passenger services on the line to Leven ceased in 1969, and in 1972, the remainder of the line to the Kirkland yard at Leven was converted to single track.[6]

The route remained open as a freight only line to serve the Cameronbridge distillery, Kirkland yard and Methil power station, the terminus of the line. Carbon dioxide produced by the distillery at Cameronbridge was carried by rail, whilst coal slurry from collieries around Fife was delivered to Methil power station using the line.[6] The last services ran on the line in 2001, at the time Methil power station was mothballed.[3] The line was unused entirely until 2011, when one mile of the route was reopened to serve a loading point for the opencast coal mine at Earlseat. Freight services ran on this section of track between 2012 and 2015.[7]

Reopening

The Levenmouth area is the largest urban area in Scotland unserved by any direct rail link, with a population of around 33,000.[8] The catchment area of the line, which would include parts of the East Neuk, would rise to around 43,000,[9] and as such was identified by Campaign for Better Transport as a priority 1 candidate for reopening.[10]

Campaigns for the reinstatement of passenger services on the route have occurred since passenger services were withdrawn in 1969. There was a significant increase in campaigning in 2008, when the Airdrie–Bathgate rail link and Borders Railway were being authorised by the Scottish Parliament. Fife Council put forward £2 million to support the reopening, with the costs were initially estimated at £28 million.[2][3][11] This estimate was later increased to £45–55 million by the end of 2008.[12][13]

SESTRAN conducted a feasibility study and Fife Council declared the project as a top-priority transport project.[3] The initial findings from the study found that there was strong support for the link as well as a strong general case for it. The study also reviewed potential train services, and found there was a possibility of extending Edinburgh-Kirkcaldy services to Leven to give an hourly service to Leven, or extending both these services and the Edinburgh-Cowdenbeath services, giving a half-hourly service.[12] It was hoped during the 2008 studies that coal and whisky freight could be carried on the line, and that the developments will encourage regeneration of the area.[3] A later study in 2008 found that it was unlikely that work could begin on the line until 2015 at the earliest.[1][12]

Campaigning for the reintroduction of passenger services continued and in 2015 Fife Council prepared a second STAG[note 1] Report. This again reported a favourable cost-benefit analysis with capital costs of £78.4 million (based on 2010 prices). The plans had been further refined by this stage, with a planned extension to Methil docks being removed as a result of demand analysis and land ownership issues.[14]

A third STAG report was prepared during 2018 and early 2019 for Transport Scotland. The preliminary options appraisal looked at a total of twelve improvements to public transport for the Levenmouth area, including upgrading bus services between Levenmouth and existing stations on the Fife Circle rail line, new rapid bus services between Levenmouth and Edinburgh, an entirely new railway on a new alignment between Markinch and Levenmouth, a hovercraft service between Levenmouth, Kirkcaldy and Edinburgh, and reinstatement of the disused railway between Leven and Thornton North Junction.[15]

These were reduced to a total of six options in the preliminary options final report in May 2019, the only remaining rail option was the reinstatement of the line between Leven and Thornton Junction. The remaining five options were a series of upgrades to public transport facilities and bus services, and improvements to 'active travel networks' which would see improved walking and cycling opportunities in combination with any upgrades to bus services and the reintroduction of rail services.[16]

By January 2024, infrastructure works were largely completed, with testing and driver training underway.[17] An announcement in March 2024, stated that the whole project was expected to open on 2 June of that year.[18]

Future

The disused Cameron Bridge railway station with the Diageo Cameronbridge distillery in the background. The station here is to be demolished and a new passenger station built further away from the distillery. Freight services to the distillery may restart.

The Scottish Government announced on 8 August 2019 that the line would be re-opened for passenger and potential freight services. It is planned that services on the line would resume by 2024. The announcement by the Scottish Government indicated that in addition to the reopening of the railway, bus services and public transport facilities will receive additional funding and improvements.[citation needed] There will also be improvements to walking and cycling routes.[4]

The full route remains the property of Network Rail and unlike the Borders Railway which required the Waverley Railway (Scotland) Act 2006, no such Act of the Scottish Parliament will be required for the Levenmouth rail link. The reopened line will serve stations at Leven and Cameron Bridge, with the potential for a freight connection to the Diageo Cameronbridge distillery site at Cameron Bridge. Cameron Bridge station would serve as a park and ride for surrounding areas.[1]

Preparatory work, including vegetation clearance, began in 2020.[19] In May 2021 sleepers for the line were delivered[20] and at the end of July 2021 work began on removing the old abandoned trackwork.[21] The main delivery phase of the project kicked off in March 2022[22] and work at Leven station began in February 2023.[23]

Service provision

Initially upon opening, the expected service level will be one train per hour between Leven and Edinburgh Waverley, calling at Cameron Bridge. Scotrail plans to increase services to two trains per hour, with one train via Kirkcaldy and along the coast, while the other train will travel via Dunfermline along the inner Fife Circle Line.[20][17]

Notes

  1. ^ Scottish Transport Appraisal Guidance, a Scottish Government process

References

  1. ^ a b c "Levenmouth Sustainable Transport Study STAG Part 1 Appraisal Report" (PDF). South East Scotland Transport Partnership (SEStran) & Fife Council. May 2008. Archived from the original (PDF) on 5 October 2011. Retrieved 16 November 2008.
  2. ^ a b c "£2m pledge for Leven rail link". Fife Today. 17 June 2008. Retrieved 6 July 2008.
  3. ^ a b c d e Abbot, J.; Sully, J. (October 2008). "Hoisting the saltire high". Modern Railways. 65 (721). Ian Allan Publishings.
  4. ^ a b "Levenmouth rail link to reopen in £70m project". BBC News Online. 8 August 2019. Retrieved 10 August 2019.
  5. ^ Piper, Laura (27 March 2024). "Trains set to service Fife area for first time in more than five decades". STV News. Retrieved 27 March 2024.
  6. ^ a b Ewan Crawford (22 October 2002). "Leven and East of Fife Railway". RAILSCOT. Retrieved 16 November 2008.
  7. ^ "Levenmouth line". Rail. 14 February 2018.
  8. ^ Davidson, Gina (9 August 2019). "Green light for £70m reopening of mothballed Fife railway". The Scotsman. Edinburgh. Retrieved 12 August 2019.
  9. ^ Armstrong, Allen (29 April 2017). "Allen Armstrong: Future of rail depends on Levenmouth line". The Scotsman. Edinburgh. Retrieved 12 August 2019.
  10. ^ "The case for expanding the rail network" (PDF). Campaign for Better Transport. January 2019. Archived (PDF) from the original on 10 August 2023. Retrieved 10 August 2019.
  11. ^ "Leader calls for rail link unity". BBC News. 17 June 2008. Retrieved 6 July 2008.
  12. ^ a b c Aileen Robertson (15 October 2008). "Further study backs rail link reopening". Tay & Fife Courier. Archived from the original on 23 December 2008. Retrieved 16 November 2008.
  13. ^ "Business Plan 2008/09-2010/11" (PDF). South East Scotland Transport Partnership. 2008. Archived from the original (PDF) on 3 July 2008. Retrieved 16 November 2008.
  14. ^ "LEVENMOUTH SUSTAINABLE TRANSPORT STUDY - STAG PART 2". Fife Council. 2015. Retrieved 11 August 2019.
  15. ^ "Levenmouth Sustainable Transport Study" (PDF). Transport Scotland. 23 November 2018. Retrieved 11 August 2019.
  16. ^ "Levenmouth Sustainable Transport Study Preliminary Options Appraisal Report" (PDF). Transport Scotland. 17 May 2019. Retrieved 11 August 2019.
  17. ^ a b "Trains return to Leven". Railways Illustrated. No. 253. March 2024. p. 10.
  18. ^ Piper, Laura (27 March 2024). "Trains set to service Fife area for first time in more than five decades". STV News. Retrieved 27 March 2024.
  19. ^ "Preparatory work continues on creating the Levenmouth Rail Link". RailAdvent. 25 March 2021. Retrieved 3 April 2021.
  20. ^ a b "Former railway yard supports work to reinstate Levenmouth rail link". Network Rail Media Centre. Retrieved 24 May 2021.
  21. ^ Kennedy, Catherine (28 July 2021). "Track work begins to restore abandoned Scots rail link". New Civil Engineer. Retrieved 29 July 2021.
  22. ^ "FAQs". Scotlands Railway. Retrieved 25 April 2023.
  23. ^ "Leven station building momentum for new rail link". Network Rail. 25 April 2023.

External links

This page was last edited on 29 March 2024, at 21:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.