To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Kellyville railway station

From Wikipedia, the free encyclopedia

Kellyville
Kellyville railway station.jpg
Guragura Street entrance, June 2019
General information
LocationSamantha Riley Drive, Kellyville
New South Wales
Australia
Coordinates33°42′49″S 150°56′08″E / 33.713711°S 150.935446°E / -33.713711; 150.935446
Elevation13 m (43 ft) above ground level [1]
Owned byTransport Asset Holding Entity
Operated byMetro Trains Sydney
Distance30km from Chatswood
Platforms2
Train operatorsMetro Trains Sydney
Connections Bus
Construction
Structure typeElevated
Parking1,200 spaces
Bicycle facilities45 spaces
AccessibleYes
History
Opened26 May 2019
Passengers
2023[3]
  • 1,789,100 (year)
  • 4,902 (daily)[2] (Sydney Metro)
Services
Preceding station Sydney Metro Following station
Rouse Hill
towards Tallawong
Metro North West Line Bella Vista
towards Chatswood

Kellyville railway station is an elevated station on the Metro North West Line, as part of the Sydney Metro network. The station was built by Impregilo-Salini and Metro Trains Sydney for Transport for NSW, and is situated along Samantha Riley Drive, Kellyville, in Sydney, Australia. Train services from the station run to Rouse Hill and Chatswood, with a journey time to Chatswood of around 33 minutes. As the New South Wales Government's Sydney's Rail Future strategy is delivered over the next 20 years, services are expected to be extended to the Sydney central business district (CBD) and Bankstown. Kellyville Station opened on 26 May 2019.[4][5]

History

Ticket barriers and concourse

Kellyville, on Sydney's rural fringes, was not considered suitable for new suburban development until 1988, when then Planning Minister Bob Carr abandoned the state's long-standing policy of concentrating new development along existing rail corridors. Instead, the government green-lit development in the area on the proviso that a corridor be preserved for mass transit to be built in future.[6] This corridor, which runs beside Old Windsor Road, was announced as the alignment for the North West T-way, a new bus rapid transit line 10 years later[7] and construction began in 2004. Kellyville's three T-way stations – known as Riley, Burns and Balmoral – opened in March 2007, providing commuters with fast bus access from Kellyville to the Parramatta CBD.[8] Commuters travelling to the Sydney CBD, however, needed to catch buses along the M2 Hills Motorway and congested Sydney Harbour Bridge.

The Government's 1998 plan also envisaged a future rail line to the Hills District, but only as far as Castle Hill.[7] Following dire warnings from the state's most senior rail bureaucrat about a looming capacity crunch on the rail system, a new "North West Rail Link" (NWRL) was proposed in 2005, featuring a station for Kellyville at the corner of Old Windsor and Burns roads – the site of the Burns T-way station, then under construction. A Burns Road Station remained government policy even when the NWRL was dumped in favour of the North West Metro proposal in 2008. The 2009 version of plan featured two stations, one at Burns Road, called Kellyville, and a second at Samantha Riley Drive.[9]

Design and construction

Platforms

The Australian Labor Party was heavily defeated at the 2011 state election in part because of its tendency to announce, cancel and re-announce transport projects.[10] The incoming Liberal/Nationals government, led by Barry O'Farrell, had put a promise to build the NWRL at the centre of their election platform. During consultation and detailed design, it was decided that Burns Road would be replaced with two stations: Bella Vista, on the edge of the giant Norwest Business Park, and Kellyville. Kellyville Station would be built on a new railway viaduct (dubbed the "skytrain") above the existing Riley T-way station.

As part of the project's public–private partnership delivery model, a consortium was chosen to operate the stations and trains. To ensure that the stations were designed to be maintainable and with customer service in mind, the operator would also be responsible for designing and building the station buildings. (An Italian joint venture, Impregilo-Salini, was chosen to build the viaduct as part of a separate $340 million contract.) The Metro Trains Sydney consortium, includes MTR Corporation, which designed, built and operates the stations on the Mass Transit Railway in Hong Kong.[11][12][13]

Work on the new station began in June 2014.[14] The NWRL was rebranded Sydney Metro Northwest the following year.

Services

A Chatswood bound service on platform 1

Kellyville has two side platforms. It is served by Metro North West Line services.[11][15] Kellyville station is served by a number of bus routes operated by Busways and CDC NSW.[16]

Platform Line Stopping pattern Notes
1 Services to Chatswood Interchange
2 Services to Tallawong

References

  1. ^ Sydney Metro. "Interactive Map". Sydney Metro. Retrieved 27 July 2019.
  2. ^ This figure is the number of entries and exits of a year combined averaged to a day.
  3. ^ "Train Station Monthly Usage". Open Data. Retrieved 26 January 2024.
  4. ^ Transport for New South Wales (June 2012). Sydney's rail future: modernising Sydney's trains (PDF). Archived from the original (PDF) on 26 June 2014.
  5. ^ Sydney Metro City & Southwest Project Overview Archived 17 September 2015 at the Wayback Machine Sydney Metro June 2015
  6. ^ Sydney Into Its Third Century: Metropolitan Strategy for the Sydney Region. Sydney: Department of Environment, Planning. 1988.
  7. ^ a b New South Wales Department of Transport (1998). Action for transport 2010: an integrated transport strategy for Sydney.
  8. ^ Besser, Linton (12 April 2007). "Priority bus green lights scrapped". The Sydney Morning Herald.
  9. ^ Sydney Metro Authority (December 2009). Sydney's metro network: priorities for shaping Sydney's growth.
  10. ^ Clune, David (2012). "Why Labor lost". In David Clune and Rodney Smith (ed.). From Carr to Keneally: Labor in office in NSW 1995-2011. Sydney: Allen & Unwin.
  11. ^ a b Kellyville Station Transport for NSW
  12. ^ North West Rail Link $340 million skytrain contract awarded Archived 2 January 2014 at the Wayback Machine Transport for NSW 18 December 2013
  13. ^ $8.3 billion North West Rail Link to open in late 2019 Archived 26 April 2014 at the Wayback Machine Transport for NSW 16 June 2013
  14. ^ Storey, Rachael (18 June 2014). "Media release: skytrain construction begins as North West Rail Link investment hits $5 billion over four years".
  15. ^ "M: Metro North West line timetable". Transport for NSW.
  16. ^ Kellyville Station Transport for NSW

External links

This page was last edited on 3 April 2024, at 01:58
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.