To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Kaniv Hydroelectric Power Plant

From Wikipedia, the free encyclopedia

Kaniv Hydroelectric Power Plant
The dam of Kaniv Hydroelectric Power Plant
Location of Kaniv Hydroelectric Power Plant in Cherkasy Oblast
LocationKaniv, Ukraine
Coordinates49°45′59.5″N 31°28′18.2″E / 49.766528°N 31.471722°E / 49.766528; 31.471722
Construction began1964
Opening dateNovember 4, 1972 (first turbine) – April 16, 1975 (completion)
Owner(s)Government of Ukraine
Dam and spillways
Type of dampower plant
ImpoundsDnieper River
Height39.5 m (130 ft)
Length343 m (1,125 ft)
Spillway capacity13,200 m3/s (466,154 cu ft/s)
Reservoir
Creates(Run-of-river)
Total capacity2.6 km3 (2,107,854 acre⋅ft)
Power Station
Operator(s)Ukrhydroenergo
Turbines24 x 18.5 MW
Installed capacity444 MW
Annual generation972 GWh

Kaniv Hydroelectric Power Plant is a hydroelectricity generating complex on the Dnieper river in Kaniv, Ukraine. It is operated by Ukrhydroenego, a subsidiary of the state-owned Energy Company of Ukraine. The dam has a 288 by 18 metres (945 ft × 59 ft) single-stage, single chamber lock to enable travel along the Dnieper river.

YouTube Encyclopedic

  • 1/3
    Views:
    6 101
    790
    2 552 480
  • Як врятувати Дніпро від цвітіння? • Ukraïner
  • Flight report | Kyiv (KBP) — Dnipro | ATR 72-600 | Windrose Airlines
  • Україна з неба • Ukraïner

Transcription

History

Planning for the power plant's facilities was conducted by UkrHydroProject, a department of the Ukrainian State Research and Project Institute. Construction was contracted out to specialized construction companies, lasting from 1972 to 1975. The plant's turbines and generators were produced by the Kharkiv branches of Turboatom and Elektrovazhmash, respectively.

Renovation of the Kaniv Hydroelectric Power Plant started in 1997. The first stage of renovation was financed through the IBRD, completing in June 2002. The second stage was financed by the Ukrainian government, supplemented by a US$106 million investment by the World Bank, completing in 2017.

See also

External links

This page was last edited on 2 April 2024, at 09:02
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.