To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Iwate-Ichinohe Tunnel

From Wikipedia, the free encyclopedia

Iwate-Ichinohe Tunnel
Tunnel profile diagram. (1): Iwate portal. (2): Ichinohe portal.(3) Typical tunnel cross-section.
Overview
LineTōhoku Shinkansen
StatusActive
CrossesŌu Mountains
Operation
Opened1 December 2002 (2002-12-01)
Technical
Line length25,810 m (84,680 ft)

The Iwate-Ichinohe Tunnel (岩手一戸トンネル, Iwate-Ichinohe Ton’neru) is a 25.81 km[1] terrestrial railway tunnel in Japan — part of the Tōhoku Shinkansen, linking Tokyo with Aomori. When opened in 2002 it was the longest in-use terrestrial (land based) tunnel in world, but the title was overtaken by the Lötschberg Base Tunnel in June 2007.

YouTube Encyclopedic

  • 1/1
    Views:
    18 474
  • Top 10 Longest Railway Tunnels in the World

Transcription

History

Timeline
1988 Surveying commenced[1]
August 1991 Construction commenced[2]
September 2000 Holed through[2]
1 December 2002 Line opened[3]
11 March 2011 Services through tunnel suspended due to earthquake[citation needed]

The tunnel is located 545 km away from Tokyo Station on the Tōhoku Shinkansen line, midway between Morioka and Hachinohe.[2] Surveying commenced in 1988. In 1991 construction began, and the tunnel holed through in 2000. The tunnel became operational when the railway line opened in 2002. Maximum depth is about 200 m.

Geography and geology

The tunnel passes through hilly terrain near the Kitakami and Ōu Mountains. The Mabuchi and Kitakami rivers run near the tunnel's Tokyo portal.[1]

Geology along the tunnel route can be divided into three sections:

Faults cross the path of the tunnel.[1]

Engineering

The tunnel is a single bore twin track design. A horseshoe shape, the cross-sectional dimensions are: 9.8 (width) x 7.7 m (height)[1] (an excavated area of approximately 70 to 85 m²[2]). It rises at a gradient of 0.5% from the Tokyo portal for approximately 22 km, then drops at a gradient of 1% down to the Aomori portal.[1] The New Austrian Tunnelling method (NATM) was adopted to cope with the geology. NATM techniques deployed included rock bolts, shotcrete and steel supports. Excavation methods were dependent on the geology, drill and blast or mechanical excavation and full face or bench cut methods were used.[2] To speed up and reduce the costs of construction the tunnel was divided into seven sections, with intermediate access ramps or inclined shafts.[1]

References

  1. ^ a b c d e f g Yamaji, H. (2001). "World's Longest Terrestrial Railway Tunnel" (PDF). JSCE. Archived from the original (PDF) on 2011-07-19. Retrieved 2009-02-09.
  2. ^ a b c d e Nagai, S. (September 2001). "The Iwate-Ichinohe Tunnel in the Tohoku Shinkansen Railway Line". JSCE Newsletter. Archived from the original on 2006-02-19. Retrieved 2006-06-01.
  3. ^ "Shinkansen service extended to Aomori Pref". Kyodo News. 1 December 2002.

40°05′51.0″N 141°16′04.8″E / 40.097500°N 141.268000°E / 40.097500; 141.268000

This page was last edited on 5 December 2022, at 00:47
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.