To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Indore Bus Rapid Transit System

From Wikipedia, the free encyclopedia

Indore BRTS
Overview
LocaleIndore, Madhya Pradesh, India
Transit typeRapid transit
Number of lines10
Operation
Began operation10 May 2013
Operator(s)Government of Madhya Pradesh
Indore Municipal Corporation
Indore City Bus
Technical
System length126.46 kilometres (78.58 mi)

The Indore BRTS or Ahilya Path Designed by Resident Engineer Shrilal Prasad NiralaTeam Leader of TCPL Indore is the bus rapid transit system for the city of Indore, Madhya Pradesh by AICTSL also called i-Bus(Intelligent Bus),[1] became operational from 10 May 2013. The Indore BRTS project started in 2007 under the Jawaharlal Nehru National Urban Renewal Mission (JNNURM). It involves the participation of the Governments of India and Madhya Pradesh, and the World Bank.

The UK-based Serco won the operation and maintenance contract of the BRT from Atal Indore City Transport Services Ltd (AICTSL), a joint venture between Indore Development Authority and Indore Municipal Corporation, which was set up to operate and manage the public transport system in the city. The company will operate and maintain the fleet of the 50 low-floor and air conditioned buses. It will also manage the operations control center and a depot for the corridor.

Under the SUTP, the Global Environment Facility will fund the setting up of the GPS-enabled Intelligent Transport System (ITS) on the BRTS.

The corridor is fully equipped with free high-speed Wi-Fi internet service for commuters, provided by Free As Air.[2]

The ITS architecture will boast, among other high-tech features, of advance signal systems based on data-centric algorithms for emergency pre-emption and network surveillance with CCTV cameras. The SUTP also envisages support for the BRTS through two Traffic Signal Prioritisation and Automatic Fare Collection plans. These include traffic signal co-ordination with adaptive signal control and a centralised traffic control centre managing 46 traffic signals and priority for BRTS buses.

The BRTS will have Automatic Fare Collection System (AFCS), which will facilitate off-board fare collection. There will also be a Ticket Office Terminal for issuing "contactless smart cards." Under the AFCS, fares will be collected by a private company on behalf of Indore City Bus.

The company, under a 10-year contract, will be responsible for the supply, installation, maintenance and operation of the AFCS, besides providing the personnel required. A similar contract-based system is planned for the AFCS of BRTS-Ahmedabad.

While the completed BRTS will cover 106 km, connecting all major corridors in Indore, Phase-I of the project proposes three corridors: the AB Road pilot corridor, the Vijayanagar Chowraha-Ujjain Road junction and Ujjain Road junction-the Airport. The current Rs. 130-crore AB Road pilot corridor runs along 11.7 km and will cater to around 70,000 passengers daily. BRTS may also be linked to the upcoming Indore Metro as planned[3]

YouTube Encyclopedic

  • 1/4
    Views:
    92 767
    117 802
    4 341
    5 314
  • How Bus Rapid Transit System Corridor Works? India's longest BRTS now in Surat #UPSC #IAS
  • iBus (Indore BRTS) Video - Short
  • iBus (Indore BRTS) Video - Complete
  • iBus (Indore BRTS) Station Automatic Sliding Doors

Transcription

Corridors

The following corridors were proposed to be executed under JNNURM.[4]

Corridor routes
Corridor No Route Length (km)
1 AB. Road 23.8 km
2 Eastern Ring Road 23.65 km
3 M.R. 10 Corridor 8.71 km
4 River Side Road Corridor 14.5 km
5 Western Ring Road 15.9 km
6 Badaganpti – Airport 5.3 km
7 RW2 Ujjain Road-AIrport 9.5 km
Other M.G Road, RNT Road and YN Road 19.1 km

Project Status

23 June 2009 :

  • Six consultants have been shortlisted for Phase-I of BRTS.[5]

15 July 2012 :

  • The 14 km-long proposed Indore BRTS project worth Rs 140 crore would be ready by September – 2012.[6]

2 February 2013 :

  • BRTS to become operational in Indore from April 2013.[7]

10 May 2013 :

  • BRTS becomes operational in Indore with 16 buses plying.[8]

References

External links

This page was last edited on 19 October 2022, at 01:58
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.