To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Indira Gandhi Super Thermal Power Project

From Wikipedia, the free encyclopedia

Indira Gandhi Thermal Power Project
Map
CountryIndia
LocationJharli, Jhajjar Haryana
Coordinates28°28′43″N 76°22′31″E / 28.47861°N 76.37528°E / 28.47861; 76.37528
StatusOperational
Owner(s)Aravali Power Company India Limited
Operator(s)Aravali Power Company India Limited
Thermal power station
Primary fuelCoal
Power generation
Units operational3 x 500 MW
Nameplate capacity1,500 MW

Indira Gandhi Super Thermal Power Project is located between Khanpur Khurd (to the south of the plant) and Jharli village (to the north of the plant) in Jhajjar district of Haryana, India.

YouTube Encyclopedic

  • 1/1
    Views:
    1 452 742
  • How does a Thermal power plant work ?

Transcription

History

Aravali Power Company Private Limited (APCPL) is a joint venture company with 50% share of NTPC Ltd, 25% of Haryana Power Generation Company Ltd (HPGCL, Haryana State company), and 25% of Indraprastha Power Generation Company Ltd (IPGCL, Delhi State company). The company was registered on 21 December 2006 as a private limited company of Central Government of India, Government of Delhi and Haryana. APCPL has constructed a coal based power plant near Village Jharli, District Jhajjar (Haryana) named Indira Gandhi Super Thermal Power Project (IGSTPP). Presently under Stage-I, a power plant of 3x 500MW capacity is constructed, whose all 3 units are commissioned. It is the largest thermal power plant located in Haryana.

Capacity

Stage Unit number Installed capacity (MW) Date of commissioning Status
Stage I 1 500 2010 October Running
Stage I 2 500 2011 November Running
Stage I 3 500 2012 March Running

External links

References

This page was last edited on 3 February 2024, at 18:49
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.