To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

I&M Rail Link
Overview
Reporting markIMRL
LocaleIllinois, Iowa, Minnesota, Missouri and Wisconsin
Dates of operation1997–2002
SuccessorIowa, Chicago and Eastern Railroad
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The I&M Rail Link (reporting mark IMRL) was a railroad operating in the north central portion of the United States. The company commenced operations on April 5, 1997, acquiring lines from the Canadian Pacific Railway and Soo Line Railroad.[1]

On July 31, 2002, the Iowa, Chicago and Eastern Railroad took over the IMRL's operations.

YouTube Encyclopedic

  • 1/3
    Views:
    39 719
    16 349
    703
  • RRB NTPC 2019 | Maths | Problem Based on Train
  • 3rd Class English || Pre Reading - Talking Train || School Education || August 09, 2021
  • short welded rail and long welded rails in railway track in tamil

Transcription

History

The I&M Rail Link, owned by the Washington Companies, operated 1,385 miles (2,229 km) of trackage in the states of Illinois, Iowa, Minnesota, Missouri, and Wisconsin. The lines were acquired from the Canadian Pacific Railway, which were originally built by the Milwaukee Road and its predecessors. The railroad commenced operations at 12:01 p.m. April 5, 1997.

Canadian Pacific Railway retained a 33% ownership in the new company and the Washington Corporation obtained the remaining 67%. The new railroad was headquartered in Davenport, Iowa, with Nahant Yard becoming the base for most operations and locomotive maintenance. Heavy locomotive repairs were handled by National Railway Equipment in Silvis, Illinois. Train dispatching was first handled by the Canadian Pacific, but those duties were later performed by the Montana Rail Link in Missoula, Montana, which is another Washington subsidiary. IMRL's principal commodities included steel, coal, agricultural and chemical products. The railroad operated with 2,284 freight cars and 118 locomotives. Train operations continued much as they did during Soo Line and CP Rail ownership.

In late 2001 Washington sought to divest itself of the railroad, stating that it was unprofitable. On July 29, 2002 the assets of the I&M Rail Link, LLC were transferred to the Iowa, Chicago & Eastern, which was owned by the Dakota, Minnesota & Eastern subsidiary, Cedar American Railroad Holdings. Operations were curtailed at 12:01 p.m. on that date. Six years later, Canadian Pacific acquired the IC&E, along with the DM&E.

References

  1. ^ "Surface Transportation Board Allows I&M Rail Link to Acquire Soo Line's Kansas City-Chicago Mainline & Soo's "Corn Lines" Located in 5 Midwestern States" (Press release). United States Surface Transportation Board. 1997-04-03. Retrieved 2008-03-27.

External links

This page was last edited on 9 May 2023, at 06:00
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.