To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

BR-287 (Brazil highway)

From Wikipedia, the free encyclopedia

BR-287
Highway of Integration
Rodovia da Integração
Route information
Length536.9 km[1] (333.6 mi)
Major junctions
East endCanoas
Major intersections
West endSão Borja
Location
CountryBrazil
StateRio Grande do Sul
Highway system

The BR-287 is a 536.9 km-long[2] federal highway across the Brazilian state of Rio Grande do Sul, also known as the Highway of Integration.[3]

It starts in the Region of Porto Alegre, traverses the Center Eastern and Central West, and ends in the Southwest region. It crosses the main tobacco-producing region of the country, in the cities of Santa Cruz do Sul and Venancio Aires, where there are many tobacco manufacturers and distributors, including Universal Leaf Tobacco, Philip Morris, Souza Cruz, Associated Tobacco Company and Alliance One.[4]

Duplication

In 2019, the Federal Government announced that BR 287 was granted to the private initiative for 30 years, with the concession beginning in 2020. A duplication of the 204 km highway between Tabaí and Santa Maria will be carried out over 5 years of works in the urban section and 11 years in total, from the beginning of the concession. The forecast is that the stretch between Tabaí and Santa Cruz do Sul will be duplicated first, between 2026 and 2028, and the duplication between Santa Cruz do Sul and Santa Maria should occur between 2028 and 2031. The highway has a movement of more than 11 thousand vehicles per day, and normally a highway must be duplicated from the moment it reaches the movement of 7 thousand vehicles per day.[5][6][7][8]

Gallery

References

  1. ^ "BR-287 length between major junctions". Ministério dos Transportes do Brasil. Archived from the original on 2013-11-09. Retrieved August 14, 2014.
  2. ^ "BR 287". Archived from the original on 2013-11-09. Retrieved 2013-04-08.
  3. ^ Legislação Informatizada — Lei nº 7.003, de 24 de Junho de 1982 - Publicação Original (in Portuguese), Câmara dos Deputados, retrieved 24 August 2014
  4. ^ "Quem são os maiores produtores de tabaco no Brasil". Archived from the original on 2019-05-30. Retrieved 2021-03-12.
  5. ^ RSC 287
  6. ^ "Empresa que assumir duplicação da RSC-287 terá 11 anos para concluir 204 quilômetros". Archived from the original on 2019-05-30. Retrieved 2020-08-05.
  7. ^ "Estudo indica quando RSC-287 deve ser duplicada entre Santa Maria e Santa Cruz". Archived from the original on 2021-01-16. Retrieved 2020-08-05.
  8. ^ Por que a RSC-287 precisa ser concedida e duplicada?

External links

This page was last edited on 21 September 2023, at 04:33
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.