To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Highland Wind Energy Center

From Wikipedia, the free encyclopedia

Highland Wind Project
Map
CountryUnited States
LocationO'Brien County, Iowa
Coordinates43°05′N 95°34′W / 43.083°N 95.567°W / 43.083; -95.567
StatusOperational
Construction began2013
Commission date2015
Construction costabout $1 billion
Owner(s)MidAmerican Energy Company
Operator(s)MidAmerican Energy Company
Wind farm
TypeOnshore
Power generation
Units operational218
Make and modelSiemens 2.3 MW
Nameplate capacity501.4 MW
Capacity factor38.6% (average 2016-2018)
Annual net output1,694 GW·h

The Highland Wind Energy Center is a 501.4 megawatt (MW) wind farm in O'Brien County, Iowa. It became the largest facility in the state when it was placed online in 2015.

YouTube Encyclopedic

  • 1/2
    Views:
    4 503
    491
  • Renewables Scotland - How energy is produced from wind, waves and tides
  • Women & Wind Technology

Transcription

Facility details

The facility is part of $1.9 billion in wind power project announced by MidAmerican Energy in 2013. It was the largest project in the world to be built in a single construction phase. Siemens supplied 218 2.3 MW wind turbines for the facility.[1]

The facility is located at the southern end of Buffalo Ridge. The Rock Island Clean Line HVDC transmission line was proposed to originate just north of the project.[2]

An expansion of the project, formerly known as Highland II was developed by Invenergy.[3] This expansion was purchased by MidAmerican Energy and constructed in 2016 as the 250 MW O'Brien Wind Farm. It also lies in O'Brien county, just to the north of the Highland project.[4]

Electricity production

Highland Wind Energy Center Electricity Generation (MW·h)[5]
Year Total Annual MW·h
2015 549,863
2016 1,809,682
2017 1,726,146
2018 1,545,240
Average (years 2016–2018) ---> 1,693,689

See also

References

  1. ^ "MidAmerican begins construction on Iowa's largest wind project". Power Engineering. Retrieved 9 May 2014.
  2. ^ "Wind energy boom blows into Northwest Iowa county". Sioux City Journal. 2 March 2014.
  3. ^ "O'Brien County's 2nd major wind farm on fast track". Cherokee Chronicle Times. Retrieved 12 February 2015.
  4. ^ O'Brien Wind Project
  5. ^ "Highland Wind, Annual". Electricity Data Browser. Energy Information Administration. Retrieved March 23, 2019.

External links

  • [1] MidAmerican Energy - Highland Wind Project


This page was last edited on 23 October 2023, at 23:22
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.