To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Hambantota Wind Farm

From Wikipedia, the free encyclopedia

Hambantota Wind Farm
Two of the five turbines formerly at the wind farm site
Map
Country
Location
Coordinates6°08′46″N 81°06′47″E / 6.1461°N 81.1131°E / 6.1461; 81.1131
StatusDecommissioned
Commission date
  • March 1999
Decommission date
  • October 2018
Construction cost
  • 280 million Rs (1999)
Owner(s)
Operator(s)
Wind farm
Type
Rotor diameter
  • 43 m (141 ft)
Rated wind speed
  • 15.5 m/s (51 ft/s)
Site elevation
  • 0 m (0 ft)
Power generation
Units operational5 × 0.6 MW
Make and modelMicon M1500-600 (5)
Nameplate capacity
  • 3 MW
Capacity factor
  • 14 %
Annual net output
  • 4,500 MW h
External links
CommonsRelated media on Commons

The Hambantota Wind Farm was a wind farm in Hambantota, Sri Lanka, owned and operated by the state-run Ceylon Electricity Board. The wind farm, which was located along south-eastern coast of Hambantota was the country's first state owned wind farm, and consisted of five NEG Micon M1500-600 wind turbines of 600 KW each. With a total installed capacity of 3 MW, the wind farm generated up to approximately 4,500 MWh of power a year.[1][2]

The wind farm cost approximately Rs. 280 million (1999 rates) to build, of which 34% were local funds and 66% were foreign funds.[1][2] Foreign funds were raised by the Global Environmental Facility and the World Bank. Studies on the project dated as early as 1988, more than a decade before it was commissioned in 1999. The wind farm was decommissioned and dismantled in late 2018.[3][4]

Specifications of the wind turbines
Subject Details
Turbine manufacturer NEG Micon
Model M1500-600
Nameplate capacity 600 KW
Cut-in wind speed 3.5 m/s (11 ft/s)
Rated wind speed 15.5 m/s (51 ft/s)
Cut-out wind speed 25 m/s (82 ft/s)
Survival wind speed 69 m/s (226 ft/s)
Hub height 46 m (151 ft)
Rotor diameter 43 m (141 ft)
Rotor swept-area 1,452 m2 (15,629 sq ft)
Rotor RPM 18 to 27
Weight of rotor 13,000 kg (29,000 lb)
Weight of nacelle 19,000 kg (42,000 lb)
Tower type Tubular steel (seven sections)
Weight of tower 40,000 kg (88,000 lb)
Diameter of tower foundation 11 m (36 ft)
Close-up of a turbine hub.

See also

References

  1. ^ a b Hambantota Wind Farm Archived 2011-03-25 at archive.today Ceylon Electricity Board
  2. ^ a b Hambantota Wind Farm Archived 2011-08-31 at the Wayback Machine CEB Pre-Electrification Unit
  3. ^ Pothmulla, Lahiru (24 October 2018). "Hambantota Wind Farm to be removed". Daily Mirror. Retrieved 30 April 2019.
  4. ^ Waidyasekera, Raja (29 October 2018). "Removal of Hambantota wind power plant imminent". Daily News. Retrieved 30 April 2019.
This page was last edited on 2 January 2024, at 07:34
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.