To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Grayling Bicycle Turnpike

From Wikipedia, the free encyclopedia

Grayling Bicycle Turnpike
Length6.5 mi (10.5 km)
LocationGrayling, Michigan
TrailheadsHartwick Pines State Park,
Michigan Ave.
UseRunning, Biking,
Roller skating
DifficultyModerate
SeasonYear Round
SightsAusable River, Interstate 75
HazardsRoad Crossings, Highway Overpasses, Steep Grade Hills with Sweeping Curves

The Grayling Bicycle Turnpike is a multiple-use, non-motorized paved trailway in Michigan, about 6.5 miles (10.5 km) long. It begins at the entrance to Hartwick Pines State Park and runs southerly along M-93, eventually meeting Business Loop Interstate 75 (BL I-75) and ending at East Michigan Avenue.

The turnpike is used for a stretch of the Avita Water Black Bear Bicycle Tour, which coincides with the Au Sable River Canoe Marathon and shadows the route of the canoes over the roadways, beginning in Grayling and ending in Oscoda.

44°42′35″N 84°42′36″W / 44.7098°N 84.70997°W / 44.7098; -84.70997


This page was last edited on 5 July 2023, at 00:10
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.