To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Yorkshire Dales Railway

From Wikipedia, the free encyclopedia

Yorkshire Dales Railway
60083 James Murray passes Rylstone with a stone service to Redcar in 2008
Overview
Other name(s)Grassington Branch
StatusOpen
Termini
Service
TypeHeavy rail
History
Commenced7 June 1900 (1900-06-07)
Opened2 July 1902 (1902-07-02)
Technical
Line length11 mi (18 km)
Number of tracks1 (was dual to former Embsay Junction)
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Yorkshire Dales Railway
Grassington & Threshfield
Threshfield Tramway
Rylstone
Embsay Junction
Haw Bank Tunnel
Skipton
crossover

The Yorkshire Dales Railway was a branch line linking the town of Skipton with the villages of Rylstone, Threshfield and Grassington in North Yorkshire, England. There were two stations on the line - Grassington & Threshfield and Rylstone - and a connection via the Skipton to Ilkley Line to Skipton.

The line closed to passengers in 1930, but is still in use up to Swinden Quarry for the transport of aggregates. It is also known as the Grassington Branch.

History

The railway company was authorised by Act of Parliament dated 6 August 1897 after several previous attempts to open a line to Grassington including one which would have driven eastwards from Gargrave. The first sod was cut on 7 June 1900 and the single-track line was opened to traffic on 29 July 1902. It was operated by the Midland Railway from the start.[1]

The station at Grassington & Threshfield was built 0.5 miles (0.8 km) short of Grassington itself, thereby saving the cost of having to cross the River Wharfe.[2] The station was built as a through station despite being the line's terminus, because there were plans to extend the line northwards to Hawes, where it would meet the Wensleydale Railway. Those plans were never realised.[3] There is only one significant engineering structure on the line; Haw Bank Tunnel (which lies under the A65 road and is 220 yards (200 m) long) which was built as part of the Skipton to Ilkley line.

The line was single track from Embsay Junction throughout, however, the section from Skipton to Embsay Junction was double track by virtue of the already existing Skipton to Ilkley line which was opened in 1888.[4] A passing loop was installed at Rylstone when traffic from the quarries at Swinden and Skirethornes (the latter via the 2-mile (3.2 km) tramway at Threshfield) increased in number.[5] The passing loop was actually north west of the station's one platform, so trains would have to wait outside the station for the other service to pass. The loop was removed in 1937, as a result of, but some years after, the cessation of passenger workings.[6] Passenger services on the line typically numbered seven a day in each direction, with one southbound working being split at Embsay Junction; the front portion of the train would go forward to Skipton, whilst the rear portion was coupled up to another locomotive, and would run east via Ilkley to Bradford Forster Square.[7]

Skirethorns Quarry, was operated by John Delaney and was 1 mile (2 km) north west of Grassington station.[8] Connection to the end of the YDR was by a small exchange siding and a 2 feet 6 inches (0.76 m) gauge rope-hauled tramway.[9] The exchange siding was just east of the main road through Threshfield, and the tramway extended to Skirethorns underneath the Grassington and Kettlewell roads. Traffic consisted of lime being taken to the Sheffield steel mills and had ceased by 1966 when the quarry was taken over by another company.[10]

Regular passenger services ceased on 22 September 1930, but freight and occasional excursion trains continued until 11 August 1969.[11] The line was the last steam-worked branchline on the British Railways system, with steam finally giving way in the summer of 1968.[12] After August 1969, the line was cut back to Swinden Quarry (9 miles 13 chains (14.7 km))[13] and it focussed strictly on sending out limestone. In 1970, new owners promoted an upsurge in rail-borne traffic which necessitated a pipeline being laid to power the kilns with gas rather than coal. As the B6265 (Skipton to Grassington road) ran between the quarry works and the railway, movements across the road had become hazardous and the company paid for the road to be moved to the eastern side of the railway line. This was completed in 1973.[14]

The YDR remains a freight-only line used for carrying bulk trainloads of limestone aggregate from the quarry to terminals in Leeds, Hull, Birmingham and Wellingborough.[15]

The "Yorkshire Dales Railway" name survives as that of the trust that operates the Embsay and Bolton Abbey Steam Railway.

The idea of full re-opening of the line to passengers, or an extension of the current Embsay and Bolton Abbey Steam Railway into Skipton, has been raised ever since the line's closure to passengers.[16]

In January 2019, Campaign for Better Transport released a report identifying the line which was listed as Priority 2 for reopening. Priority 2 is for those lines which require further development or a change in circumstances (such as housing developments).[17]

References

  1. ^ Bairstow 2004, p. 84.
  2. ^ Suggitt 2005, p. 17.
  3. ^ "Disused Stations: Grassington & Threshfield Station". www.disused-stations.org.uk. Retrieved 9 October 2015.
  4. ^ "Skipton to Ilkley railway line celebrates 125th anniversary". Craven Herald. 3 October 2013. Retrieved 13 September 2017.
  5. ^ Suggitt 2005, p. 20.
  6. ^ Binns 1990, p. 11.
  7. ^ Bairstow 2004, p. 85.
  8. ^ "OL2" (Map). Yorkshire Dales - Southern & Western Area. 1:25,000. Explorer. Ordnance Survey. 2016. ISBN 9780319263310.
  9. ^ Binns 1990, p. 10.
  10. ^ Binns 1990, pp. 10, 15.
  11. ^ Blakemore, Michael (2005). "Wharfedale". Railways of the Yorkshire Dales. Ilkley: Great Northern Books. p. 6. ISBN 1-905080-03-4.
  12. ^ Bairstow 2004, p. 88.
  13. ^ Brailsford, Martyn (2016). Railway Track Diagrams 2: Eastern (4 ed.). Frome: Trackmaps. p. 42. ISBN 978-0-9549866-8-1.
  14. ^ Binns 1990, p. 34.
  15. ^ Rawlinson, Mark (2015). Freightmaster 78. Swindon: Freightmaster Publishing. pp. 103, 110, 113, 143. ISSN 1357-4841.
  16. ^ "Re-opening rail lines". bettertransort.org.uk. Retrieved 13 September 2017.
  17. ^ "The case for expanding the rail network" (PDF). Campaign for Better Transport. p. 42. Retrieved 22 April 2019.

Sources

  • Awdry, C. (1990), Encyclopaedia of British Railway Companies, Patrick Stephens Ltd, Wellingborough, ISBN 1-85260-049-7
  • Bairstow, Martin (2004). Railways through Airedale & Wharfedale. Farsley: Bairstow. ISBN 1-871944-28-7.
  • Binns, Donald (1990). The Yorkshire Dales Railway; the Grassington Branch. Skipton: Northern Heritage. ISBN 0-907941-35-4.
  • Suggitt, Gordon (2005). Lost Railways of North & East Yorkshire. Newbury: Countryside Books. ISBN 978-1-85306-918-5.

External links

This page was last edited on 19 February 2024, at 18:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.