To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Golfech Nuclear Power Plant

From Wikipedia, the free encyclopedia

Golfech Nuclear Power Plant
Golfech NPP cropped.jpg
Golfech Nuclear Power Plant
Official nameCentrale Nucléaire de Golfech
CountryFrance
LocationGolfech (Tarn-et-Garonne)
Coordinates44°6′24″N 0°50′43″E / 44.10667°N 0.84528°E / 44.10667; 0.84528
StatusOperational
Construction began1982
Commission dateFebruary 1, 1991 (February 1, 1991)
Operator(s)EDF
Nuclear power station
Reactor typePWR
Reactor supplierFramatome
Cooling towers2 × Natural Draft
Cooling sourceGaronne River
Power generation
Units operational2 × 1363 MW
Make and modelAlstom
Nameplate capacity2726 MW
Capacity factor75.3%
Annual net output17,992 GW·h
External links
CommonsRelated media on Commons

The Golfech Nuclear Power Plant is located in the commune of Golfech (Tarn-et-Garonne), on the border of Garonne between Agen (30 km downstream) and Toulouse (90 km upstream) on the Garonne River, from where it gets cooling water, it is approximately 40 km west of Montauban.

The station has two operating nuclear reactors that are both pressurized water reactors of the French P'4 design. The plant also has two 178.5-metre-tall cooling towers[1] that get water from the Garonne River, only using water to compensate for evaporation; the cooling loop is closed and water is never released back into the river.

In 2002 the plant produced nearly half of the electricity used in the area. It employs nearly 700 full-time workers.

History

In 1965, the Midi-Pyrénées announced its intention to construct a nuclear plant near Malause. EDF then went about securing a site for the station. In 1967 a board of inquiry initially laid out plans for two UNGG reactors with an output of 800 MWe each.

Due to falling petroleum prices and conflicts between EDF and CEA, the project was delayed, with a decision made between 1967 and 1969. In 1969 after the departure of Charles de Gaulle, CEA gave up on the UNGG plans.

In 1973, a nearby hydroelectric plant of 63 MW was completed and the regional manager for EDF announces plans for PWRs at the same site to be finished by 1985.

In 1978, EDF announces that Golfech would be the site for 4 PWRs eventually of 1300 MWe each.

On June 17, 1979, 5000 protesters walked on the future site and released balloons.

Events

These are all 1 on the INES scale and occurred in 1998.

  • on September 28, 1998 at the time of an operation check of the measuring equipment of the neutron flux in the middle of the reactor, the operator did not respond to one of the signals that should have been investigated.
  • on November 4 the Autorité de sûreté nucléaire discovered that on October 14, EDF ran the reactor with an overpower of 7% for 30 hours.
  • on November 27 the containment building is evacuated following an alarm due to an atmospheric detection of radioactivity. Ten workers are slightly contaminated.

References

  1. ^ Hydraulic works study of Golfech cooling towers, 1989, Goldwirt, F.; Ghuzel, M.; Lemoine, P.; https://inis.iaea.org/search/searchsinglerecord.aspx?recordsFor=SingleRecord&RN=21068176
This page was last edited on 25 June 2020, at 08:52
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.