To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Gasoducto del Noreste Argentino

From Wikipedia, the free encyclopedia

Gasoducto del Noreste Argentino
Location
CountryBolivia, Argentina
FromBolivia
Passes throughCampo Durán, Sáenz Peña, Vera
ToSanta Fe, Argentina
General information
TypeNatural Gas
OwnerEnarsa
ContractorsTechint
Expected2010
Technical information
Length1,465 km (910 mi)
Maximum discharge10 billion cubic meter
Diameter30 in (762 mm)

Gasoducto del Noreste Argentino (also known as the Argentine Northwest Gas Pipeline and GNEA pipeline) is a proposed 1,465 kilometres (910 mi) long natural gas pipeline to transport natural gas from Bolivia to Argentina.

YouTube Encyclopedic

  • 1/3
    Views:
    3 109
    1 172
    561
  • Sistema de Transporte de Gas Natural por Gasoductos, Reglamento Unico de Transporte RUT
  • Proyecto Castor en la Red de Gasoductos: Qué Pasaría si el Almacén no se pone en Servicio [IGEO.TV]
  • FINANCIERA SUSTENTABLE: TRANSPORTE PÚBLICO CON GAS NATURAL

Transcription

History

The pipeline project was announced in 2003.[1] The agreement between Bolivia and Argentina to build the pipeline was signed on 26 March 2007.

Technical features

The length of the pipeline is 1,465 kilometres (910 mi) and the capacity will be 10 billion cubic meter (bcm) of natural gas per annum.[1]

Construction

The pipeline would be built by Techint.[2] The construction is expected to start in July 2008. Pipes for the pipeline would be provided by Siat or Tubacero. The pipeline is expected to be commissioned by January 2010 and it is expected to cost US$1.8 billion.[1]

See also

References

  1. ^ a b c Lucas Bergman; Helen Popper (25 January 2008). "Work on Bolivia-Argentina gas line to start in July". Reuters. Retrieved 13 July 2008.{{cite news}}: CS1 maint: multiple names: authors list (link)
  2. ^ "Bolivia mulls gas pipeline to Argentina". Pipeline & Gas Journal. February 2004. Retrieved 13 July 2008.

External links


This page was last edited on 8 May 2024, at 04:47
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.