To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Garden Banks Pipeline

From Wikipedia, the free encyclopedia

The Garden Banks Pipeline is a 30-inch diameter natural gas transmission pipeline [1] which gathers gas from the offshore Gulf of Mexico and brings it into Enbridge Pipelines UTOS system, which leads into various locations in Louisiana and Texas. One end of the pipeline originates from Cameron, Louisiana, and it spans for 50 miles (80 kilometres).[2] Since 2005, the pipeline itself is 100% owned by Enbridge Offshore (Gas Transmission) L.L.C.,[3] a subsidiary of the multinational pipeline company Enbridge, which has the longest pipeline system in North America. Its FERC code is 148.[4] According to the FERC website, the company total cost for pipeline operations in the 2022 fiscal year was $60,318, 949.[5]

Location

The Garden Banks Gas Pipeline is located entirely within the Gulf of Mexico, extending from Garden Banks Block 128 to South Marsh Island Block 76,[6] and intersects with four existing pipelines to move gas onshore. The Garden Banks 72 platform is a base for gathering deepwater production from the Garden Banks area, and acts as a junction platform connecting both the Cameron Highway Oil Pipeline and the Poseidon Oil Pipeline System.[7]

Garden Banks makes up just one component of the 26,000 miles of oil and gas pipelines on the Gulf of Mexico's seafloor.[8] The region is home to one of the most developed oil and gas industry sectors in the world.

Gulf of Mexico topographic location map

Process

Garden Banks transports natural gas from the Cardamom field [owned by Shell], a reservoir about 360 kilometres (220 miles) southwest of New Orleans, and 4 miles below the sea floor. The gas is drilled via the Auger tension leg platform [located in Garden Banks Block 428], which is owned by the Royal Dutch Shell company.[9] It has a capacity of transporting one billion cubic feet of gas per day.

YouTube Encyclopedic

  • 1/1
    Views:
    79 652
  • SOLIDWORKS Routing – Creating Piping Spools

Transcription

References

  1. ^ Enbridge Inc (October 18, 2022). "Enbridge's Energy Infrastructure Assets" (PDF). Enbridge.
  2. ^ "Going Deep: Enbridge's Offshore Pipelines" (PDF). www.enbridge.com. Retrieved 2022-10-23.
  3. ^ "Enbridge acquires full interest in Garden Banks Gas Pipeline - NS Energy". Retrieved 2022-10-23.
  4. ^ "Three Digit Pipeline Code List for Index of Customers (Form 549B) | Federal Energy Regulatory Commission". www.ferc.gov. Retrieved 2022-11-08.
  5. ^ "Gas Assessment Table for FERC Administrative Charges for FY 2022 | Federal Energy Regulatory Commission". www.ferc.gov. Retrieved 2022-10-29.
  6. ^ "LINK® Informational Postings". infopost.enbridge.com. Retrieved 2022-10-27.
  7. ^ "EX-99.3". www.sec.gov. Retrieved 2022-10-23.
  8. ^ "Gulf of Mexico Data Atlas". www.ncei.noaa.gov. Retrieved 2022-11-06.
  9. ^ "Cardamom". www.shell.com. Retrieved 2022-10-23.

External links


This page was last edited on 23 February 2024, at 20:21
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.