To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Gadani
گڈانی
Gaddani
Gadani Beach
Gadani Beach
Country Pakistan
Province Balochistan
DivisionKalat
DistrictHub District
Population
 • Total10,000
Time zoneUTC+5 (PST)

Gadani (Urdu: گڈانی) is a coastal town of Hub District[1] located in the southern part of Balochistan along the Arabian Sea, Pakistan. and is just a 1-hour drive away from Karachi. The population of Gadani was estimated to be around 10,000 in 2005. More than 97% of the population is Muslim with a small Hindu minority. The majority of the population speaks Balochi, Brahui languages and there is a small Lasi speaking minority. They belong to the Sanghur, Kurd, Sajdi, Muhammad Hasni, Gurginari and Bezinjo tribes.

Many prehistoric shell-midden sites were discovered along the shores of a small bay, near Gadani. They are characterized of heaps of fragments of marine and mangrove shells among which are flint and jasper tools and stone querns. The first radiocarbon dates obtained from these middens indicate they result from the activity of people who settled along the coast both during the seventh and the fifth millennium before present.

There is a feasibility study ongoing for establishing a port in Gadani.[2]

YouTube Encyclopedic

  • 1/3
    Views:
    904 158
    152 553
    3 058
  • Gaddani Sea site incident|Gadani seaview| Gadani picnic point|Gadani visit|Gadani dangerous wave۔
  • Ship Breaking yard at Gadani Beach of Balochistan Pakistan | پاکستان
  • Gadani Ship breaking Yard - Lasbela

Transcription

Gadani Power Project

Gadani Power Project (also known as Pakistan Power Park) was a proposed energy complex in Gadani, Balochistan, Pakistan under the China-Pakistan Economic Corridor.[3] In August 2013, Pakistani Government announced to establish ten coal power plants of total capacity of 6,600 MW with technical and financial assistance mostly from China. China is providing with debt to cover 85% of the project cost, while the rest of the finances would be arranged by the government of Pakistan. The total cost of the project is PKR 144.6 billion.[4]

10×660 MW coal based power plants at Gadani Energy Park will be constructed, while Chinese have agreed to invest in 6 projects, two projects will be constructed by ANC Dubai and one project has been initiated by Government of Pakistan.[5] The Ciner Group of Turkey has agreed to immediately start work on a 660 MW coal power plant at Gadani.[6]

Gadani Ship Breaking Yard

The world's third largest ship breaking yard, Gadani ship-breaking yard is located in Gadani.

Gadani ship-breaking yard is the world's third largest ship breaking yard located across a 10 km (6.2 mi) long beachfront at Gadani, Pakistan. The yard consists of 132 ship-breaking plots.[7] It is located about 40 km (25 mi) northwest of Karachi, the largest city of Pakistan.[8]

In 1980s, Gadani was the largest ship-breaking yard in the world, with more than 30,000 direct employees. However, competition from newer facilities in Alang, India and Chittagong, Bangladesh resulted in a significant reduction in output, with Gadani, today, producing less than one fifth of the scrap it produced in the 1980s. The recent reduction in taxes on scrap metal has led to a modest resurgence of output at Gadani, which now employs around 6,000 workers.

Over one million tons of steel is salvaged per year, and much of it is sold domestically. In the 2009-2010 fiscal year, a record 107 ships, with a combined light displacement tonnage (LDT) of 852,022 tons, were broken at Gadani whereas in the previous 2008-2009 fiscal year, 86 ships, with a combined LDT of 778,598 tons, were turned into scrap.

It currently has an annual capacity of breaking up to 125 ships of all sizes, including supertankers, with a combined LDT of 1,000,000 tons.

See also

References

  1. ^ Correspondent, The Newspaper's Staff (3 February 2022). "Lasbela bifurcated, Hub made new district". DAWN.COM. Retrieved 5 February 2022.
  2. ^ https://tribune.com.pk/story/2031328/1-balochistan-uplift-cpec-focus-first-ndc-meet/
  3. ^ "Gadani power project suspended". 24 February 2015.
  4. ^ "CDWP clears 6,600 MW Pakistan Park Project costing Rs144.6b - The Express Tribune". 17 July 2014. Retrieved 23 March 2018.
  5. ^ "MoU for 1,320MW coal-based plants at Gadani signed « PAKISTAN RENEWABLE ENERGY SOCIETY". Archived from the original on 24 March 2014. Retrieved 24 March 2014.
  6. ^ "Turkish company agrees to build 660MW power plant in Gaddani - The Express Tribune". 15 February 2014. Retrieved 23 March 2018.
  7. ^ "Record 107 ships dismantled at Gaddani" by Parvaiz Ishfaq Rana, Dawn, 29 June 2010 (http://archives.dawn.com/archives/business/2010-06-29.html)
  8. ^ "Distance between Karachi and Gaddani".

External links


25°07′10″N 66°43′55″E / 25.11944°N 66.73194°E / 25.11944; 66.73194

This page was last edited on 18 April 2023, at 17:44
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.