To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Frank J. Wood Bridge

From Wikipedia, the free encyclopedia

Frank J. Wood Bridge
Frank J. Wood Bridge c. 2021
Coordinates43°55′16″N 69°57′57″W / 43.92111°N 69.96583°W / 43.92111; -69.96583 (Frank J. Wood Bridge)
Carries
  • Pedestrians
  • Automobiles
  • Trucks (1932 (1932)–2021 (2021))
  • Tram (1932 (1932)–1937 (1937))
CrossesAndroscoggin River
LocaleTopsham/Brunswick, Maine
Other name(s)Green Bridge
Named forFrank J. Wood
OwnerMaine
Maintained byMaine Department of Transportation
Heritage statusEligible for the National Register of Historic Places
ID numberME 2016
Preceded byAndroscoggin Swinging Bridge
Followed byMaine State Route 196
Characteristics
DesignThrough Truss
MaterialSteel and Concrete
Total length815 ft (248 m)
Width30.8 ft (9.4 m)
Longest span310.1 ft (94.5 m)
No. of spans3
Load limit10 short tons (9.1 t)
Clearance above15.7 ft (4.8 m)
Clearance below23 ft (7.0 m)
No. of lanes2
History
Constructed byBoston Bridge Works
Built1932
Construction cost300,000 US dollars
Rebuilt
  • 1936
  • 1985
ReplacesBrunswick-Topsham Bridge
Statistics
Daily traffic19,400 vehicles (2010)
Location
Map
References
National Bridge Inventory[1]

The Frank J. Wood Bridge (known locally as The Green Bridge) is a three span, through truss bridge crossing over the Androscoggin River between the towns of Topsham and Brunswick, Maine, on U.S. Route 201. Opened in 1932, the bridge was originally called the Brunswick-Topsham bridge (as was its predecessor) but was officially renamed the Frank J. Wood Bridge, after a local farmer who suggested the location.

The bridge has met requirements to be considered for the National Register of Historic Places, both as a standalone historic site and as a component of the Brunswick Commercial Historic District. Despite its eligibility, the Maine Department of Transportation (MaineDOT) has initiated the building of a new bridge that will replace the deteriorating Frank J. Wood Bridge by 2025.

History

Previous bridges

Built in 1827, this was the first bridge at this location to be supported by stone pillars
Built in 1827, this was the first bridge at this location to be supported by stone pillars.

There have been several bridges just below Brunswick Falls, on the Androscoggin river, separating the towns of Topsham and Brunswick, Maine.[2]

The First Bridge was built in the summer of 1796. It was built with wood and was swept away by a freshet (flood) in 1811. In 1811, there was a second wooden bridge that was built, but was also swept away by a flood in 1827. In 1827, a third bridge was built of wood but with its foundation and piers made of stone. This bridge would also have a covered version but was destroyed by a fire in 1842. In 1871, the fourth bridge was built in an open style, and was a toll bridge. Shortly after completion, it was jointly purchased and taken over by the towns of Topsham and Brunswick, made toll free, and known as the Free Bridge. The fifth bridge was built of light iron, but was swept away by yet another flood in 1896.[2] The Topsham-Brunswick Bridge, the sixth bridge, was constructed in 1897 using stronger iron; however, it was deemed unusable in 1927 after a trolley jumped its tracks and destroyed some of its supports.[3] The Frank J. Wood Bridge opened in 1932 and was the seventh bridge to occupy the location.[2]

Namesake

Frank J. Wood was the proprietor of a farm in Topsham, Maine. Before the bridge was built, he petitioned the state to move the location slightly from where the older bridge was located. He was rewarded for his efforts with the name of the bridge. Wood died only three years after the opening of the Frank J. Wood Bridge in 1935.[4]

Design

Tram on the Frank J. Woods Bridge
Tram on the Frank J. Woods Bridge

In 1931, the state of Maine commissioned Boston Bridge Works, to construct a new bridge over the Androscoggin River to replace the old Topsham-Brunswick Bridge that was deemed unsafe.[5] The bridge was made from 1,500 short tons (1,400 t) of steel,[5] as well as concrete, and was originally constructed with tram rails twenty feet apart.[6]

The Frank J. Wood bridge was built to withstand any future floods that may come its way. However, The great flood of 1936, encapsulating all of New England, destroyed part of the bridge,[7] but it was rebuilt and at full operating capacity by September of the same year.[8]

In 1944, the rails from the tram line were paved over with asphalt[9] after the Maine Central Railroad abandoned the tracks in 1937.[10]

In 1972, steel was added to the grid deck. In 1985, repairs were made to the steel grid deck and loose bearings, and all structural steel was repainted.[11]

1985 protest

On December 16, 1985, Harry C. Crooker and Sons, a construction company, along with other contractors, staged a protest on the bridge, objecting to the long lines of traffic that often accumulated. At the time, the Brunswick-Topsham Bypass Advisory Committee along with legislators from the state of Maine were attempting to get a bill passed that would ensure a U.S. Route 1 bypass, easing congestion on the bridge. The protest consisted of one hundred and thirty dump trucks and flatbeds crossing over the bridge in a line that went on for 4 miles (6.4 km).[12] The U.S. Route 1 bypass was approved for construction and opened to the public on November 11, 1997.[13]

2019–2024 lawsuits

Commemorative plaque on the Frank J. Wood Bridge
Commemorative plaque on the Frank J. Wood Bridge c. 2021.

On September 6, 2019, a lawsuit was submitted to the United States District Court for the District of Maine by the Friends of the Frank J. Wood Bridge, the National Trust for Historic Preservation, and the Historic Bridge Foundation. The plaintiffs of the suit asked the court for an injunction to halt the construction of a new bridge until the state complies with the National Environmental Policy Act of 1970. Plaintiffs claimed the removal of the bridge would violate the policy act due to the impact on the fish ladder at the Brunswick hydroelectric plant adjacent to the bridge. Plaintiffs also claimed in their suit that rehabilitation would be more cost effective than construction of a new bridge, arguing that the state was inaccurate in their cost assessment.[14][15]

On February 3, 2021, federal judge Lance E. Walker ruled in favor of MaineDOT in regards to replacing the bridge, with an exception to the ruling for the state to reassess their cost estimate for rehabilitation.[16] On March 8, 2021 the three organizations from the 2019 lawsuit filed an appeal to the initial ruling,[17] citing the bridge's eligibility to the National Register of Historic Places.[18] The appeal was denied on January 5, 2022 by the United States Court of Appeals for the First Circuit, citing the state was still responsible for a new assessment for rehabilitating the bridge.[19]

On June 16, 2022, the U.S. district court ordered the state of Maine to pay 84,000 United States dollars in legal fees due to the state not assessing the cost of rehabilitation in the correct manner.[20] In January 2023, the state again concluded that it would be cheaper to build a new bridge[21] and started the process for construction companies to bid for the job.[22]

A second lawsuit was filed by Friends of the Frank J. Wood Bridge, the National Trust for Historic Preservation, the Historic Bridge Foundation and Waterfront Maine on February 24, 2023. In this lawsuit, the plaintiffs accused the state of Maine of violating the Department of Transportation Act and the National Environmental Policy Act’s protections on historic sites.[23] As part of the lawsuit, an injunction was filed to try and stop the construction of a new bridge. Judge Lance Walker denied the motion at the end of July 2023.[24] In January 2024, Judge Lance Walker once again ruled in favor of the state, allowing the construction of the replacement to continue.[23]

Eligibility for historic status

After an initial review of the bridge, in 2016, from MaineDOT and the Federal Highway Administration, stated the bridge would not be eligible for the National Register of Historic Places. in 2017, they reevaluated and determined that the Frank J. Wood Bridge was eligible both as an individual historic place and as part of the Brunswick Commercial Historic District. Eligibility is determined by how important it is to local transportation, specifically because it's connected to regional interurban trolley lines. The Federal Highway Administration stated "While most of the features associated with the interurban line are no longer withstanding, the standard width and height of the bridge, set specifically to accommodate the interurban line, was adequate integrity to convey that significance."[25]

Replacement

The Frank J. Wood Bridge from the viewpoint of Brunswick with the Pejepscot Paper Company mill building in the background
The Frank J. Wood Bridge from the viewpoint of Brunswick with the Pejepscot Paper Company mill building in the background, c. 2021.

In 2015, an inspection of the bridge revealed that both the deck and superstructure had deteriorated,[26] resulting in a reduction of the structural load to 25 short tons (23 t). Another inspection in 2021 revealed that the bridge was deteriorating faster than expected, leading to a further reduction of the structural load to 10 short tons (9.1 t) by MaineDOT.[27]

Even though the Frank J. Wood Bridge is eligible for the National Register of Historic Places, MaineDOT has determined it needs replacement.[28] Preliminary designs for a new bridge would be slightly upstream of the Frank J. Wood bridge, closer to the dam at Pejepscot Falls, have bicycle lanes, pedestrian sidewalks, a viewing area, and public parks on both sides.[29][30]

In 2023, MaineDOT moved forward to replace the Frank J. Wood Bridge with a cost estimate of $49,900,000, awarding a contract for the new bridge construction to Reed & Reed.[22] The new bridge will be a structure made of steel plate girders and concrete, consisting of four spans.[31]

Two-way traffic on the new bridge is expected to be completed in late 2025. Furthermore, the construction of the new parks on both sides of the bridge will be completed in early 2026.[32] The replacement will be the eighth bridge to occupy the location since 1796,[2] with deconstruction of the Frank J. Wood bridge to begin in October 2025.[33]

References

  1. ^ "National Bridge Inventory Data Sheet" (PDF). historicbridges.org. 2011. Archived (PDF) from the original on May 22, 2022. Retrieved September 10, 2023 – via Federal Highway Administration.
  2. ^ a b c d Christian, Sheldon (May 18, 1963). "Androscoggin River of Rampage at Least 26 Times in 150 Years". Sun Journal (Lewiston, Maine). pp. 1-A, 5-A, 7-A. Archived from the original on August 21, 2023. Retrieved September 7, 2022 – via Newspapers.com.
  3. ^ Walkup, Jules (January 11, 2024). "Why midcoast residents have unsuccessfully fought to save this failing bridge". Bangor Daily News. Bangor, Maine. Archived from the original on January 12, 2024. Retrieved January 12, 2024.
  4. ^ "Frank J. Wood: Had Topsham-Brunswick Bridge Named After Him Four Years Ago". Daily Sun. April 13, 1935. p. 2. Archived from the original on August 21, 2023. Retrieved April 9, 2023 – via newspapers.com.
  5. ^ a b "Topsham Bridges to be Rebuilt – No Expense to Town". Sun Journal (Lewiston, Maine). April 26, 1929. p. 13. Archived from the original on August 21, 2023. Retrieved September 8, 2022 – via newspapers.com.
  6. ^ "Brunswick: Cong. Beedy's Topic at Rotary "The World Depression"—Salvation Army Tag Day". Daily Sun. October 12, 1931. p. 10. Archived from the original on August 21, 2023. Retrieved September 8, 2022 – via newspapers.com.
  7. ^ O'Connor, Joe (February 3, 1986). "The flood of '36: Heavy snowfall, record rain and sudden thaw devastated Maine, U.S." The Lewiston Daily Sun. p. 9. Archived from the original on August 21, 2023. Retrieved September 8, 2022 – via newspapers.com.
  8. ^ "New Service to Mark Rail Time Changes - Service Over Brunswick Bridge Also to Start Sunday". Evening Express. September 21, 1936. p. 1. Retrieved September 10, 2023 – via newspapers.com.
  9. ^ "Brunswick". The Lewiston Daily Sun. August 4, 1944. p. 9. Archived from the original on August 21, 2023. Retrieved September 8, 2022 – via newspapers.com.
  10. ^ Cummings, Osmond Richard (1966). "Trolleys to Brunswick, Maine – 1896–1937". National Railway Historical Society. p. 5. Archived from the original on September 20, 2022. Retrieved September 9, 2022 – via Bangor Public Library.
  11. ^ "Androscoggin Bridge Bids to be Opened". The Lewiston Daily Sun. July 7, 1985. p. 16. Archived from the original on August 21, 2023. Retrieved June 18, 2023 – via newspapers.com.
  12. ^ Hammond, Sara (December 16, 1985). "Truckers protest Brunswick bottleneck". Morning Sentinel. pp. 1, 10. Archived from the original on August 21, 2023. Retrieved June 18, 2023 – via newspapers.com.
  13. ^ "Merrymeeting Bridge is Mommy's Bridge". Sun Journal. Lewiston, Maine. Associated Press. November 12, 1997. p. A2. Archived from the original on August 21, 2023. Retrieved June 18, 2023 – via newspapers.com.
  14. ^ Hoey, Dennis (September 9, 2019). "Historic preservation groups sue to save iconic Brunswick-Topsham bridge". The Times Record. Archived from the original on April 9, 2023. Retrieved April 3, 2022.
  15. ^ Friends of the Frank J. Wood Bridge; National Trust for Historic Preservation in the United States; Historic Bridge Foundation,  21-1188 (United States Court of Appeals for the First Circuit 4 January 2022), archived from the original.
  16. ^ Moore, Darcie (February 3, 2021). "Federal Judge Rules in Favor of MDOT on Brunswick-Topsham Bridge Replacement Suit". The Times Record. Brunswick, Maine. Archived from the original on April 9, 2023. Retrieved April 9, 2022.
  17. ^ Moore, Darcie (March 10, 2021). "Topsham-Brunswick group files appeal to stop bridge replacement". Portland Press Herald. Portland, Maine. p. B3. Archived from the original on August 21, 2023. Retrieved April 9, 2023 – via newspapers.com.
  18. ^ Carter, C. Thacher (November 24, 2021). "MaineDOT: 'We will do what we have to' to ensure bridge safety". The Times Record. Brunswick, Maine. pp. A1, A10. Archived from the original on August 21, 2023. Retrieved April 9, 2023 – via newspapers.com.
  19. ^ Carter, C. Thacher (January 6, 2022). "Court sides with state over plans to replace the Frank J. Wood Bridge". Sun Journal. Lewiston, Maine. p. C6. Archived from the original on August 21, 2023. Retrieved April 9, 2023 – via newspapers.com.
  20. ^ Terhune, John (June 21, 2022). "Judge Rules Government Must Cover Legal Fees of Town Bridge Proponents". Portland Press Herald. Portland, Maine. pp. B1, B2. Archived from the original on August 21, 2023. Retrieved April 9, 2023 – via newspapers.com.
  21. ^ Terhune, John (February 4, 2023). "Frank J. Wood Bridge replacement project out for bid". The Times Record. Brunswick, Maine. Archived from the original on April 9, 2023. Retrieved April 9, 2023.
  22. ^ a b Claffey, Jason (April 4, 2023). "$50 million Brunswick-Topsham bridge replacement expected to start this spring". The Times Record. Brunswick, Maine. Archived from the original on April 7, 2023. Retrieved April 7, 2023.
  23. ^ a b Feinberg, Robbie (January 9, 2024). "Federal judge again sides with state over fate of Frank J. Wood Bridge". Bangor Daily News. Bangor, Maine. Archived from the original on January 9, 2024. Retrieved January 9, 2024.
  24. ^ Claffey, Jason (July 31, 2023). "Judge denies request to stop construction of new Brunswick-Topsham bridge". The Times Record. Brunswick, Maine. Archived from the original on July 31, 2023. Retrieved August 1, 2023.
  25. ^ Senk, Julie (January 16, 2018). "Addendum to Supplemental Supporting Information for a Finding of Effect" (PDF). MaineDOT. Archived (PDF) from the original on September 20, 2022. Retrieved September 18, 2022.
  26. ^ McGuire, Peter (August 16, 2016). "Brunswick Span Gets Weight Limit". The Times Record (Maine). Brunswick, Maine. Archived from the original on August 21, 2023. Retrieved April 5, 2023 – via newspapers.com.
  27. ^ Carter, C. Thacher (November 22, 2021). "Commercial vehicles prohibited from using bridge connecting Brunswick and Topsham". The Times Record. Archived from the original on September 20, 2022. Retrieved September 18, 2022.
  28. ^ "Main(e) Street Bridge Project". Androscoggin River Walk. Archived from the original on September 20, 2022. Retrieved September 18, 2022.
  29. ^ "Frank J. Wood Bridge Replacement Virtual tour". RDV Systems. 2018. Archived from the original on August 29, 2023. Retrieved April 9, 2023.
  30. ^ "Frank J. Wood Bridge Replacement Project". maine.gov. Archived from the original on January 14, 2024. Retrieved March 7, 2024.
  31. ^ "Frank J. Wood Bridge Replacement". reed-reed.com. Archived from the original on March 27, 2024. Retrieved March 27, 2024.
  32. ^ Bleikamp, Jim (July 22, 2023). "Long Awaited Bridge Work Begins". Radio Midcoast WCME. Brunswick, Maine. Archived from the original on July 23, 2023. Retrieved July 23, 2023.
  33. ^ "Brunswick bridge set for demolition". Sun Journal. Lewiston, Maine. October 20, 2023. Archived from the original on October 21, 2023. Retrieved October 21, 2023.

External links

This page was last edited on 12 April 2024, at 16:57
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.