To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Outfitting of Russian battleship Poltava in Admiralty Shipyard, 1912

Fitting out, or outfitting, is the process in shipbuilding that follows the float-out/launching of a vessel and precedes sea trials. It is the period when all the remaining construction of the ship is completed and readied for delivery to her owners. Since most of the fitting-out process is interior work, this stage can overlap with latter stages, such as the sea trials.

Launching or floating

After a vessel has been floated (in contemporary shipbuilding) or launched (in traditional shipbuilding), it is then towed out of its drydock and moored at a fitting-out berth.[1] While still afloat, its construction is then continued. Depending on the type of vessel, fitting-out can last weeks or many months. Vessels with comparatively little space for human occupation, such as oil tankers, bulk carriers and container ships, can take the least time for fitting. Conversely, passenger ships take the longest. The process can include:

  • completion of the superstructure,
  • installation of the ship’s power plant, engines, and other machinery,
  • interior equipment and systems, including electrical, plumbing, and HVAC,
  • finishing of interior spaces,
  • and installation of furnishings.

Whatever construction is completed during fitting is also dependent on the shipyard’s capabilities and the availability of equipment prior to floating. For example, Queen Mary 2 was originally to have its propeller pods installed prior to floating, but this was not done until the fitting-out stage.

Contemporary ship construction usually has the vessel returning to drydock several times for installation of propulsion mechanisms (such as propulsion pods in contemporary vessels) and for the painting of surfaces below the waterline.

References

This page was last edited on 2 February 2024, at 02:29
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.