To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

EsTram
EsTram
EsTram
Overview
OwnerEskişehir Metropolitan Municipality
LocaleEskişehir
Transit typeTram
Number of lines8
Number of stations74
Annual ridership39,986,332[1] (2022)
WebsiteEsTram
Operation
Began operationDecember 2004
Number of vehiclesBombardier Flexity Outlook, Škoda ForCity[2] (47 vehicles)[3]
Train length29.5 m (96 ft 9 in)
Technical
System length55 km (34 mi)
Track gauge1,000 mm (3 ft 3+38 in) metre gauge
Average speed50 km/h (30 mph)
Top speed70 km/h (45 mph)

EsTram (Eskişehir Tramvay) is a tram network in Eskişehir, Turkey, owned by the Eskişehir Metropolitan Municipality. The system operates Bombardier Flexity Outlook and Škoda ForCity[2] low-floor articulated light-rail trams.[citation needed]

Construction began in August 2002 and operation of the first phase commenced on 24 December 2004 with a total length of 15 kilometers (9.3 mi)[3] and two main lines, Otogar–SSK and Opera–Osmangazi University.[4] The EsTram network is designed to carry passengers at a top speed of 50 km/h (31 mph) in mixed traffic.[citation needed]

In 2014, the second phase was completed with four extensions to the network.[3][5] The newly added lines were Emek–71 Evler, Batıkent–SSK (ring), Çamlıca–SSK (ring) and Çankaya–Osmangazi University (ring). The Emek–71 Evler line was extended in 2019 to reach the city hospital.[citation needed]

The third phase was completed in 2021 when the 75. Yıl–Sultandere and City Hospital–Kumlubel extensions were opened on 12 March and 14 June respectively. As of 2024, the system has eight lines.[3][6]

YouTube Encyclopedic

  • 1/5
    Views:
    5 999 694
    736 304
    532 240
    860 631
    1 547 436
  • The Gulf Stream Explained
  • Mysterious Nord Stream Pipeline Explosion Finally Solved By Pulitzer Prize Winner
  • Islands In The Stream - Line Dance (Dance & Teach)
  • What is the jet stream and how does it affect the weather?
  • The Engineering Behind Russia's Deadlocked Pipeline: Nord Stream 2

Transcription

Lines

Line Route Length Electrification Stations[6] Notes
 1  Otogar ↔ SSK[7] 750V DC Overhead line 16
 3  Osmangazi Üniversitesi ↔ SSK 15
 4  Otogar ↔ Osmangazi Üniversitesi 15
 7  Osmangazi Üniversitesi ↔ Çankaya 12
 8  SSK ↔ Batıkent 15
 9  SSK ↔ Çamlıca 10
 10  Şehir Hastanesi ↔ Kumlubel 23
 12  75. Yıl ↔ Osmangazi Üniversitesi 26
TOTAL: 55 km 74


References

  1. ^ "İstatistik" [Statistics]. EsTram (in Turkish). 2022. Archived from the original on 5 February 2024. Retrieved 20 March 2024.
  2. ^ a b "İşte Eskişehir'in yeni tramvayları". Anadolu Gazetesi (in Turkish). 7 March 2018. Archived from the original on 20 March 2024. Retrieved 20 March 2024.
  3. ^ a b c d "ESTRAM - Tarihçe". EsTram (in Turkish). Archived from the original on 5 February 2024. Retrieved 20 March 2024.
  4. ^ "Hatlarımız" [Our Lines]. EsTram (in Turkish). Archived from the original on 12 March 2024. Retrieved 20 March 2024.
  5. ^ "Eskişehir, raylı sistem kapasitesini iki katına çıkardı". Dünya (in Turkish). 19 October 2014. Archived from the original on 25 October 2020. Retrieved 20 March 2024.
  6. ^ a b "Hat Şema" [System Map]. EsTram. Archived from the original on 20 March 2024. Retrieved 20 March 2024.
  7. ^ "Eskişehir tramvay durakları 2023". Anadolu Gazetesi (in Turkish). 4 August 2023. Archived from the original on 20 March 2024. Retrieved 20 March 2024.

External links


This page was last edited on 20 March 2024, at 20:15
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.