To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

The Elbe Project (German: Elbe-Projekt) was the name of the first commercial, static high voltage direct current transmission system constructed in the world. The scheme was based on mercury arc valves.

Experimental installations between Wettingen and Zürich in Switzerland, and Charlottenburg and Moabit, Berlin, were demonstrated between 1933 and 1942. Contracts were signed with AEG and Siemens in 1941, and construction began of a bipolar direct current line from the Vockerode power station near Dessau on the Elbe, to Berlin-Marienfelde, in 1943. The line was designed to transmit 60 megawatts using a symmetrical bipolar operating voltage of +200 kV and −200 kV. Two single-core buried cables with aluminum conductors were used. A piece of the cable used can be seen in the Deutsches Museum, Munich.

While the former converter valve hall at Vockerode Power Plant still exists and was used as a workshop, the corresponding hall at Berlin-Marienfelde, which was situated just north of today's Marienfelde substation, was demolished and replaced by a large hardware store.

The system was never put into service owing to the chaos in Germany at the end of World War II. The Soviets dismantled the system as part of war reparation payments, and reused it in building the 115 kilometre long 200 kV Moscow–Kashira monopolar high voltage direct current line with a maximum transmission rating of 30 megawatts in 1951.[1] This transmission line is no longer operating.

Sites

Site Coordinates
Vockerode converter station (today workshop) 51°50′40″N 12°21′50″E / 51.84444°N 12.36389°E / 51.84444; 12.36389 (Elbe-Project - Vockerode converter station (today workshop))
Berlin-Marienfelde converter station (demolished, today hardware store) 52°25′49″N 13°22′42″E / 52.43028°N 13.37833°E / 52.43028; 13.37833 (Elbe-Project - Marienfelde converter station (demolished, today hardware store))

References

  1. ^ Kimbark, E.W., Direct current transmission, volume 1, Wiley Interscience, 1971, pp 7–8.

External links

This page was last edited on 14 March 2024, at 13:01
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.