To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

El Dorado and Wesson Railway

From Wikipedia, the free encyclopedia

El Dorado and Wesson Railway
Overview
HeadquartersEl Dorado, Arkansas
Reporting markEDW
LocaleArkansas
Dates of operation1905–present
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge

The El Dorado & Wesson Railway is a shortline rail carrier in the state of Arkansas,[1] Its line runs 5.5 miles from El Dorado, Arkansas to Newell, Arkansas.[1]

YouTube Encyclopedic

  • 1/3
    Views:
    30 470
    96 616
    30 676
  • Le train d'OR - Adolf Hitler - Documentaire RMC-HD-VFF
  • Bushmaster AR-15 Part 1
  • FBP SubmachineGun

Transcription

History

The backstory of the line begins with the opening of a small lumber mill in Wesson, Arkansas in 1904.[2] The Arkansas Southern Railroad built a five mile spur to the mill, which the railroad continued to own but which was operated by the mill.[2] However, as the mill expanded, its owners decided to make a change, and on September 17, 1905 incorporated the El Dorado & Wesson Railway.[1] That railroad built 10.2 miles of track from Wesson to El Dorado in October 1907, allowing the mill to bypass the Arkansas Southern trackage and interconnect with another railroad directly.[2][1]

For a time, the line also carried passengers, but that ended about 1953.[1] In January, 1959, trackage was abandoned between Wesson and Oak Hill, Arkansas, about 6.9 miles.[1] However, about 2 miles of that line was reopened from Oak Hill to Newell in 1961.[1] Thus the line as currently configured has about 5.5 miles of track from El Dorado to Newell.[1]

Operations

Traffic on the line is petroleum products, chemicals, and medium density fiberboard.[1]

The line interconnects with the Union Pacific at El Dorado.[1]

The company employs 11 people.[2]

References

  1. ^ a b c d e f g h i j "El Dorado & Wesson Railway EDW #247". Union Pacific. Retrieved August 31, 2021.
  2. ^ a b c d "Railroads, lumber mills have long history in Union Co". Janice McIntyre, El Dorado News-Times, November 5, 2016. Retrieved August 31, 2021.

External links


This page was last edited on 11 August 2023, at 16:27
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.