To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Dornoch Firth Bridge

From Wikipedia, the free encyclopedia

Dornoch Firth Bridge
Dornoch Firth Bridge in November 2006
Coordinates57°50′38″N 4°06′36″W / 57.844°N 4.11°W / 57.844; -4.11
OS grid referenceNH747852
CarriesA9, two footways, two cycle tracks
CrossesDornoch Firth
LocaleTain
Other name(s)Dornoch Bridge
Characteristics
DesignPrestressed box girder on inclined leg portals
MaterialConcrete
Total length892 metres (2,927 ft)
Width13.2 metres (43 ft)
No. of spans21
Piers in water20
History
DesignerChristiani & Nielsen
Engineering design bySir Alexander Gibb & Partners, Tony Gee & Partners
Constructed byChristiani & Nielsen
Construction startlate 1989
Construction cost£13.5 million
OpenedAugust 1991
Inaugurated27 August 1991
ReplacesRound-trip via Bonar Bridge
Location
Map

The Dornoch Firth Bridge is a road bridge over the Dornoch Firth, carrying traffic between Tain and Dornoch.

YouTube Encyclopedic

  • 1/3
    Views:
    460
    2 821
    4 171
  • [GB] A9 Inverness to Thurso, Part 1: Inverness to Dornoch Firth Bridge
  • The Great Scotland Motorcycle Road Trip - Part 5-6
  • The Great Scotland Motorcycle Road Trip - Part 3-6

Transcription

History

It was built for the Scottish Office. There had been recent substantial improvements of the A9 between Inverness and Tain, including the cable-stayed Kessock Bridge at Inverness in 1982. The Dornoch Bridge was to be the final link in the chain. Tenders were open to bid from 1986, and 40 companies showed an interest in the contract. Ove Arup and Crouch Hogg Waterman of Glasgow produced a set of initial design parameters for companies to build. The joint-venture chosen to build the bridge put in a quote for £9.5 million, and won the contract in early 1988. There were proposals that the bridge should be constructed so as to allow the Far North railway line to benefit from the shorter route as well, with the potential for up to 45 minutes to be saved on the journey between Inverness and Thurso/Wick. However this part of the scheme failed to secure government funding, and so only a road bridge was built.[1]

Design

Each of the 21 spans is about 44 metres (144 ft) long.[2] The Project Manager was Nigel Beaney of Christiani & Nielsen. Prestressed concrete rather than steel was chosen as the material to improve the life of the bridge. The design had to be approved by the Royal Fine Art Commission for Scotland.

Construction

Plaque for the bridge's opening in 1991

It was built by a joint venture of Christiani & Nielsen. It cost £13.5 million (£31 million current value). At the time it was one of the longest bridges in Europe built with the cast-and-push method, or incremental launch.

The bridge deck was built in a temporary factory 20 metres south of the southern end of the bridge. Each section of the bridge was pushed with 600 tonnes (590 long tons; 660 short tons) of hydraulic force over PTFE bearings on the top of the bridge supports. The launch nose section[3][4] had a light steel composition to reduce the cantilever moment as it was inched over an open span. Each deck section was constructed as around 21 metres (69 ft) in length – half a span. The concrete used welded mat reinforcement. The pre-stressing of each section had 38 Macalloy bar tendons of 40 mm thickness. The sections would be cast on a Monday morning and pushed on a Friday, this later being on a Thursday. Each deck section weighed around 14,000 tonnes (13,780 long tons; 15,430 short tons).

Opening

Aerial view in August 2004

The bridge was opened by The Queen Mother on Tuesday, 27 August 1991. It replaced, via a roundabout with the A836 to the south and a road junction with the A949 to the north, the 26-mile (42 km) round trip over Bonar Bridge.

See also

References

  1. ^ "A Better Railway for the North". Caithness.org. Retrieved 1 March 2018.
  2. ^ Concrete Quarterly Winter 1991 - British Cement Association Archived 15 August 2012 at the Wayback Machine
  3. ^ Launch nose side view
  4. ^ Launch nose front view

External links

Media related to Dornoch Bridge at Wikimedia Commons

Video clips

This page was last edited on 11 July 2023, at 16:48
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.