To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Don Mueang railway station

From Wikipedia, the free encyclopedia

Don Mueang

ดอนเมือง
Modernization of the long-distance train platforms
General information
LocationSanambin Subdistrict, Don Mueang District
Bangkok
Thailand
Coordinates13°55′11″N 100°36′04″E / 13.919727°N 100.601072°E / 13.919727; 100.601072
Operated byState Railway of Thailand (SRT)
Managed byMinistry of Transport
Platforms8
Tracks8
Construction
Structure typeElevated
Platform levels4
Other information
Station codeดม., RN08
ClassificationClass 1
History
Opened26 March 1896; 127 years ago (1896-03-26) (at-grade)
2 August 2021; 2 years ago (2021-08-02) (elevated)
Closed19 January 2023 (2023-01-19) (at-grade)
Services
Preceding station State Railway of Thailand Following station
Krung Thep Aphiwat
Terminus
Northern Line
long-distance services
Rangsit
towards Chiang Mai
Northeastern Line
long-distance services
Rangsit
Bang Sue Junction Northern Line
ordinary and commuter services
Rangsit
towards Chiang Mai
Northeastern Line
ordinary and commuter services
Rangsit
Preceding station SRT Red Lines Following station
Kan Kheha Dark Red Line Lak Hok (Rangsit University)
towards Rangsit
Proposed
Preceding station Airport Rail Link Following station
Terminus High-Speed Rail Linking Three Airports Krung Thep Aphiwat
towards U-Tapao
Location
Map

Don Mueang station (Thai: สถานีดอนเมือง, pronounced [sā.thǎː.nīːdɔ̄ːnmɯ̄a̯ŋ]) is a railway station in Bangkok. It is located opposite Don Mueang International Airport. It currently serves the SRT Dark Red Line and long-distance intercity trains on the Northern and Northeastern Line of the State Railway of Thailand. There is a pedestrian bridge directly linking the new station to the airport.

YouTube Encyclopedic

  • 1/5
    Views:
    65 901
    5 429
    4 761
    85 804
    3 292
  • New Train Line in Bangkok | How To Reach Don Mueang Bangkok Airport #livelovethailand
  • Red Line Train Bangkok l Don Muang Airport
  • SRT Red Line: Easier Travel Between Don Mueang & Central Bangkok - Bangkok, Thailand Travel
  • Bangkok to Don Mueang Airport by Train in 15 Baht
  • สถานีรถไฟดอนเมือง เขตดอนเมือง กทม. (Don Mueang Railway Station at Bangkok Thailand)

Transcription

History

Don Mueang station opened in 1898 as part of Thailand's first railway between Bangkok and Ayutthaya.[1] Its initial station structure was located on the airport side. However, this was moved after the construction of Vibhavadi Rangsit Road. A new station structure was constructed in 2013 in concordance with the construction of the SRT Dark Red Line. This new elevated station structure is located 700 meters from the original station, above the site of the former Talat Mai Don Mueang railway halt. There are two levels, whereby the lower four platforms are for long-distance intercity and commuter trains, while the upper four platforms are for the SRT Dark Red Line.

Dark Red Line services began running from the elevated station on 2 August 2021. Long distance trains started operating from the elevated station on 19 January 2023, with the at-grade station closing on the same day.[2][3]

Station layout

U4
Upper Platform Floor
(suburban train)
Platform 1 Dark Red Line toward Rangsit
Island platform, doors open on the left/right.
Platform 2 Dark Red Line toward Rangsit
Platform 3 Dark Red Line toward Krung Thep Aphiwat
Island platform, doors open on the left/right.
Platform 4 Dark Red Line toward Krung Thep Aphiwat
U3
Lower Platform Level
(Long-distance Train)
Platform 5 Northern Line Northeastern Line toward Ban Phachi Junction
Island platform, doors open on the left/right.
Platform 6 Northern Line Northeastern Line toward Ban Phachi Junction
Platform 7 Northern Line Northeastern Line toward Krung Thep Aphiwat and Bangkok (Hua Lamphong)
Island platform, doors open on the left/right.
Platform 8 Northern Line Northeastern Line toward Krung Thep Aphiwat and Bangkok (Hua Lamphong)
U2
ticket sales class
ticket sales floor Exit 1-4, Passenger Service Center, Ticket Office, Ticket Machine, Shop, Connecting Walkway to Don Mueang Airport
G
Street level
- Kamphaeng Phet 6 Road, Don Mueang Airport (Domestic Terminal), Don Mueang New Market

Gallery

References

  1. ^ "State Railway of Thailand (SRT) - History". Ministry of Transport. Archived from the original on 2020-09-21.
  2. ^ "นั่งรถไฟฟ้ามาชมเครื่องบิน ที่สถานีรถไฟดอนเมือง". Archived from the original on 2021-09-18.
  3. ^ "การรถไฟฯ กำหนดให้วันที่ 19 มกราคม 2566 ปรับเปลี่ยนขบวนรถไฟทางไกล เหนือ ใต้ อีสาน ของขบวนรถด่วนพิเศษ รถด่วน รถเร็ว จำนวน 52 ขบวน".[permanent dead link]
This page was last edited on 8 February 2024, at 12:05
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.