To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Dahisar East metro station

From Wikipedia, the free encyclopedia


Dahisar East
Mumbai Metro terminus
General information
LocationGhartan Pada, Dahisar East, Mumbai, Maharashtra 400068
Coordinates19°15′04″N 72°52′01″E / 19.2511°N 72.8670°E / 19.2511; 72.8670
Owned byMumbai Metropolitan Region Development Authority (MMRDA)
Operated byMaha Mumbai Metro Operation Corporation Limited (MMMOCL)
Line(s)Line 2A
Platforms2 (2 side platform)
Tracks2
Connections
Construction
Structure typeElevated, Double track
ParkingNo
History
Opened2 April 2022; 21 months ago (2022-04-02)
Services
Preceding station Mumbai Metro Following station
Terminus Line 2A Anand Nagar
Future services
Terminus Line 9
(under construction)
Pandhurang Wadi
Location
Map

Dahisar East is the elevated northern terminal station on the North-South corridor of the Yellow Line 2A of the Mumbai Metro in Mumbai, India. This metro station is located on the Western Express Highway in Northern Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was opened to the public on 2 April 2022.

YouTube Encyclopedic

  • 1/1
    Views:
    202 020
  • Mumbai Metro Line 9 Progress | Dahisar To Mira Bhayandar Double Decker Metro Line

Transcription

History

J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[1] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[2]

Dahisar East was opened to the public on 2 April 2022, along with the first phase of Line 2A.[3]

Station layout

L1
Platforms
Side platform, doors will open on the left
Platform 2      Line 2 toward Andheri West (Anand Nagar)
Platform 1      Line 2 termination platform
Side platform, doors will open on the left
M Mezzanine Fare control, station agent, Metro Card vending machines, crossover
G Street level Exit/Entrance

Power and signaling system

Like all other stations and railways of Mumbai metro, Dahisar East station also uses 25,000 volt AC power system by overhead catenary to operate the trains.

References

  1. ^ "Tainted J Kumar Infraporjects bags Dahisar-DN Nagar Metro 2A project". dna. 9 August 2016. Archived from the original on 15 October 2016. Retrieved 14 October 2016.
  2. ^ "MMRDA to conduct test run for two elevated Metro lines next week". Mumbai Mirror. IANS. 26 May 2021. Retrieved 9 July 2023.
  3. ^ "Mumbai: Phase 1 of Metro Line 2A and 7 opened for public". The Indian Express. 3 April 2022. Retrieved 9 July 2023.
This page was last edited on 5 January 2024, at 18:52
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.