To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Cuiabá Light Rail

From Wikipedia, the free encyclopedia

Cuiabá Light Rail
Overview
Native nameVLT de Cuiabá
LocaleCuiabá, Mato Grosso, Brazil
Transit typeLight rail
Number of lines0 (2 planned)
Number of stations0 (33 planned)
Daily ridership120,000 (projected)
Technical
System length0 (22 km (14 mi) planned)
System map

CPA
Batalhão
Morada do Ouro
Praça das Bandeiras
Avenida Juliano Costa Marques
Rua Luis Felipe
Avenida Senegal
Rua Cereja
Rua Trigo de Loureiro
Avenida Mato Grosso
Centro
Praça dos Bandeirantes
Praça dos Motoristas
Rua Flamengo
Rua Capitão Iporá
Rua Haiti
Rua Alziro Zarur
Avenida Carmindo de Campos
Rua Professor Filogônio
Rua Antônio Dorileo
Rua Pau Brasil
Coxipó
Praça Bispo Dom José
Igreja Nossa Senhora Auxiliadora
Rua Caetano Santana
Travessa Tuffic Affi
Cuiabá
Várzea Grande
Rua Vila Mariana
Rua Vereador Abelardo Azevedo
Avenida Dom Orlando Chaves
Secretaria Municipal dos Transportes
Auto Shopping Fórmula
Avenida Couto Magalhães
Aeroporto

Cuiabá Light Rail (Portuguese: VLT de Cuiabá) is an unfinished light rail in the Brazilian city of Cuiabá, Mato Grosso. Work on the line has been suspended since 2015 due to suspicion of bidder fraud.[1] As of 2021, there is no intention to finish the construction and the system is to be replaced by BRT.[2]

The light rail system was designed to connect Cuiabá ("Centro Político Administrativo") with Cuiabá International Airport in the city of Várzea Grande.[3]

The spanish manufacturer CAF delivered 40 tramway cars of the Urbos series with seven elements. They are 44 meters long.[4]

YouTube Encyclopedic

  • 1/3
    Views:
    1 857
    751
    1 799
  • VLT em Nova Jérsei ( Estados Unidos )
  • Prémio SECIL Universidades Eng. Civil 2011 - Adaptação da Ponte da Arrábida ao metro ligeiro
  • Searching for Wildlife in the Pantanal of Brazil

Transcription

Planned system

Cuiabá's Light Rail was planned to be 22 kilometres (14 mi) in length,[5] operating on two lines:

Line Termini Length (km) Stations Status
1 Airport ↔ Centro Político Administrativo (CPA) 15 22 Under construction
2 Centro ↔ Coxipó 7.2 11 Under construction

References

  1. ^ "Justiça Federal prorroga suspensão de obra do VLT na Grande Cuiabá" (in Portuguese). Portal G1. 16 February 2016. Retrieved 16 May 2016.
  2. ^ "Mato Grosso descarta VLT e terá BRT com ônibus elétricos e articulados entre Cuiabá e Várzea Grande". Diário do Transporte (in Brazilian Portuguese). 2020-12-21. Archived from the original on 2021-04-29. Retrieved 2021-04-29.
  3. ^ "VLT deveria ser entregue nesta 5ª em Cuiabá mas previsão é só dezembro" [VLT should be delivered in Cuiabá this Thursday but is expected only in December]. G1 (Rede Globo) (in Portuguese). 13 March 2014. Retrieved 2014-11-22.
  4. ^ "Rio tramway expands and explores surplus Cuiabá LRVs". Retrieved 2024-01-07.
  5. ^ "Governo garante ao TCE conclusão de trecho do VLT de Cuiabá até maio" [Government guarantees the completion of Cuiabá VLT's ECA stretch by May]. G1 (Rede Globo) (in Portuguese). 25 February 2014. Retrieved 2014-11-22.
This page was last edited on 7 January 2024, at 15:22
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.