To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

From Wikipedia, the free encyclopedia

Coquitlam Dam
LocationCoquitlam, British Columbia
Coordinates49°21′14″N 122°46′37″W / 49.35389°N 122.77694°W / 49.35389; -122.77694
Opening date1914
Operator(s)BC Hydro
Dam and spillways
ImpoundsCoquitlam River
Height31 m
Length290 m
Reservoir
CreatesCoquitlam Lake
Surface area1100 ha

Coquitlam Dam is a hydraulic fill embankment dam on the Coquitlam River in the city of Coquitlam, British Columbia. Although it has no powerhouse of its own, its waters divert to Buntzen Lake, making it part of BC Hydro's electrical generation infrastructure.[1] It is also one of the main reservoirs for the Greater Vancouver Water District. BC Hydro has released a new document in March 2018 that addresses emergency preparedness and outlines the areas effected should the dam fail as a result of an extreme earthquake event.[2]

YouTube Encyclopedic

  • 1/3
    Views:
    483
    778
    455
  • Fraser Valley, July 2003
  • A Time for Rivers
  • A Day in the Woods: Fish Habitat Protection

Transcription

History

The first Coquitlam Dam, built to raise the water level of Coquitlam Lake by five feet, was begun in April 1904, and completed in 1905. It was built to protect the water supply to powerhouses on Indian Arm, via a tunnel to Buntzen Lake, and also supplied water to New Westminster.[3] By 1906 the original dam was discovered to be leaking, and while repairs were made the leak continued through 1908, until a second dam was completed in 1914. At the time of the tunnel's completion, it was the longest power diversion tunnel in the world.[3] Due to seismic concerns, an embankment dam was built on the downstream side of the original rockfill dam in 2008.[4]

The Port Moody-Coquitlam Railway, no longer operating, was built to assist with the dam's construction.

References

  1. ^ BC Hydro: Coquitlam River and Buntzen Lake Watersheds Archived 2007-10-13 at the Wayback Machine Retrieved on 22 February 2009
  2. ^ "Coquitlam Dam Emergency Flood Map" (PDF).
  3. ^ a b Will Koop: Coquitlam Watershed History Archived 2006-10-07 at the Wayback Machine Retrieved on 22 February 2009
  4. ^ BC Hydro: Coquitlam Dam Seismic Upgrade Archived 2009-02-15 at the Wayback Machine Retrieved 12 March 2009

External links


This page was last edited on 8 January 2022, at 20:03
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.