To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Conveyor (sternwheeler)

From Wikipedia, the free encyclopedia

Conveyor on Fraser River 1913
History
Canada
NameConveyor
Laid down1908 in Victoria for Skeena River
Launched1909 on Skeena River May 12, 1912 on Fraser River
In service1909–1914
ReinstatedRebuilt in 1911 at Tête Jaune Cache for Fraser River
FateRetired in 1914
General characteristics
Length141.7 ft (43.2 m)
Beam34.8 ft (10.6 m)
NotesNo.130885

The Conveyor was one of five sternwheelers built for the use on the Skeena River by Foley, Welch and Stewart for construction work on the Grand Trunk Pacific Railway. The other four were the Operator, the Skeena, the Distributor and the Omineca. Three of these, the Conveyor, the Operator and the Distributor were built at Victoria, British Columbia in 1908 by Alexander Watson Jr.[1]

Skeena River

The Conveyor began her work on the Skeena River in 1909 under the command of Captain Jack Shannon. She and the other four Foley, Welch and Stewart sternwheelers had their work cut out for them. The construction of the railway from Prince Rupert to Hazelton was one of the most difficult sections of track that would ever be laid in North America. This 186 mile stretch would take nearly four years to build and would employ thousands of workers.

At the end of the season of navigation in 1911, the Conveyor and her sister ship Operator were finished on the Skeena, but would continue to work on the Grand Trunk Pacific from the other end of construction on the upper Fraser River.

Fraser River

The Conveyor and the Operator were both taken down to Victoria and dismantled, and their machinery and equipment was put in boxcars and shipped by rail to Jasper, Alberta and then to the end of steel at the eastern end of construction. Because the tracks had not reached the head of navigation yet, the boilers and other equipment had to be hauled by mule wagon the last 25 miles to the shipyard at Tête Jaune Cache. It was a difficult and dangerous operation, taking a full week, and one construction worker was killed. At Tête Jaune Cache, the machinery was put into new hulls, and the two new ships were once again named Operator and Conveyor, and both were put back under the command of their old captains. Both were launched on at Tête Jaune Cache on May 12, 1912.[2]

The Conveyor was a large and powerful steamer, capable of carrying 200 passengers, 200 tons of freight, and could also handle a 100-ton barge. In 1912, the Operator and the Conveyor began work on the upper Fraser but were confined to the area around Tête Jaune Cache as it was a season of very low water and river navigation for these large sternwheelers was nearly impossible. The Conveyor and the Operator worked regularly during the season of 1913 and then were berthed for the winter at Mile 142 on the downriver side of a new low-level bridge that had just been built, which had cut off navigation for sternwheelers to go further upriver. This bridge had come as an unpleasant surprise to the BC Express Company, which had been promised that the bridges along the upper Fraser would be built with lift-spans to allow sternwheelers access to travel underneath them.[3][4]: 52, 53  However, the low-level bridge made no difference to the two Foley, Welch and Stewart boats, who were finished on this section of the upper Fraser.

Conveyor under GTP bridge at Fort George 1914

In 1914, their next task would be to work on the construction for the Pacific Great Eastern Railway which was being built from Fort George south. Their new route would take them from Fort George to Soda Creek.

The Conveyor and the Operator worked this route from May to August 1914, serving the new work camps and hauling supplies and equipment for rail construction.

By 1914, the rivalry between the FW&S boats and the BC Express boats was quite heated and it soon came down to a race. The Conveyor had proved itself to be swifter than its sister ship Operator, as had the BX proven swifter than the BC Express, so one day in July, Captain Shannon challenged Captain Browne to a race to Quesnel from Soda Creek.[5] The rules were rather odd, as the BX was still obligated to stop and deliver her mail at several different landings whereas the Conveyor had no such obligation and could run right through. As the race progressed, it soon became obvious to all that the BX was the faster boat, as she had stayed ahead for most of the race, despite having to stop several times. At one landing the BX had more mail to deliver than usual and had fallen behind the Conveyor, but she soon caught up and was passing her opponent when Captain Johnson rammed the BX with the Conveyor. Captain Browne immediately pulled over to inspect his boat for damages and the Conveyor pulled ahead again. Browne soon discovered that the Conveyor had hit the BX just where the shear of her guards met and that there was no serious damage. When Browne arrived in Quesnel, he had almost caught up with the Conveyor again. When the full tale was heard by the local populace, it was unanimously agreed that the BX was the winner and she was declared the "Speed Queen of the Fraser". Captain Shannon, meanwhile was apologetic, and had stated that he just got caught up in the moment.[4]: 86–91 

That was the last race on the upper Fraser River, because that August would bring the onset of World War I and the halting of construction of the Pacific Great Eastern. The Conveyor and the Operator both ceased work immediately and were hauled out of the river and left to rot at Foley's Cache at Fort George.[2]

See also

References and further reading

  • Downs, Art (1971). Paddlewheels on the Frontier Volume 1. Foremost Publishing. ISBN 0-88826-033-4.
  • West, Willis (1985). Stagecoach and Sternwheel Days in the Cariboo and Central BC. Heritage House. ISBN 0-919214-68-1.
  • West, Willis (1949). The BX and the Rush to Fort George. British Columbia Historical Quarterly.
  • Leonard, Frank (1996). A Thousand Blunders: The History of the Grand Trunk Pacific Railway in Northern British Columbia. UBC Press. ISBN 0-7748-0552-8.

Notes

  1. ^ West, Willis (1949). The BX and the Rush to Fort George. British Columbia Historical Quarterly. p. 185.
  2. ^ a b Downs, Art (1971). Paddlewheels on the Frontier Volume 1. Foremost Publishing. pp. 57, 58. ISBN 0-88826-033-4.
  3. ^ Leonard, Frank (1996). A Thousand Blunders: The History of the Grand Trunk Pacific Railway in Northern British Columbia. UBC Press. pp. 212–214. ISBN 0-7748-0552-8.
  4. ^ a b West, Willis (1985). Stagecoach and Sternwheel Days in the Cariboo and Central BC. Heritage House. ISBN 0-919214-68-1.
  5. ^ West, Willis (1949). The BX and the Rush to Fort George. British Columbia Historical Quarterly. pp. 212–217.
This page was last edited on 25 July 2023, at 20:32
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.