To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Completed-contract method

From Wikipedia, the free encyclopedia

The Completed-contract method is an accounting method of work-in-progress evaluation, for recording long-term contracts. GAAP allows another method of revenue recognition for long-term construction contracts, the percentage-of-completion method. With this method, revenue is recognized when the contract is fulfilled. The contract is considered complete when the costs remaining are insignificant.

YouTube Encyclopedic

  • 1/3
    Views:
    26 110
    17 811
    10 444
  • Summary of Percentage of Completion, Cost Recovery,Completed Contract Methods (FA Tutorial #50)
  • Percentage of completion method ch 18 p 10--Intermediate Accounting CPA exam
  • Percentage Of Completion Method, Long Term Contract (Loss Realized On Unprofitable Contract)

Transcription

General description

Accounting for long term contracts can be done in two ways: through the completed-contract method and the percentage of completion method. The choice between the two depends on the provisions of SOP 81-1 from the AICPA. The completed-contract method recognizes income only when the contract is completed or substantially completed.[1]

When to use

The completed-contract method is used when costs are difficult to estimate, there are many ongoing small jobs (one time work), and projects are of short duration. This method can be used only when the job will be completed within two years from inception of a contract.[2]

Balance sheet presentation

  • In current assets is shown excess of costs over billings: the current asset accounts are "due on accounts", a receivable account, and "construction in progress" ("CIP" - or "costs in excess of billings").
  • In current liabilities is shown the excess of billings over costs ("progress billings"): these are progress billings on uncompleted contracts in excess of costs.

References

  1. ^ Samuel C. Weaver; J. Fred Weston (23 February 2004). Finance & Accounting for Non-Financial Managers. McGraw-Hill Professional. p. 30. ISBN 978-0-07-143536-9. Retrieved 4 March 2012.
  2. ^ Michael C. Thomsett (July 2001). Builder's Guide to Accounting. Craftsman Book Company. p. 25. ISBN 978-1-57218-105-2. Retrieved 4 March 2012.

Sources

  • Wiley IFRS 2015: Interpretation and Application of International Financial Reporting Standards, PKF International Ltd, ISBN 978-1-118-88955-8, February 2015, 1032 Pages.

External links

This page was last edited on 24 March 2021, at 21:59
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.