To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Combined Construction and Operating License

From Wikipedia, the free encyclopedia

The Combined Construction and Operating License (Regulatory Guide 1.206, COL) replaced the previous Draft Regulatory Guide 1145 as the licensing process for new nuclear power plants in the United States. It is a part of a newer "streamlined" process that encourages standard plant designs, and prevents delays in operation that contributed to the mothballing of many plants since the 1980s. "A combined license authorizes construction and conditional operation of a nuclear power plant. The application for a combined license must contain essentially the same information required in an application for an operating license issued under 10 CFR Part 50, including financial and antitrust information and an assessment of the need for power. The application must also describe the inspections, tests, analyses, and acceptance criteria (ITAAC) that are necessary to ensure that the plant has been properly constructed and will operate safely."[1]

Previously, the licensing process had two steps, a construction permit and an operating license, each of which required a different application to be filed and reviewed. Oppositions raised before a plant started operation versus before it started construction could thus be extremely financially damaging to a utility.

A COL may reference an Early Site Permit (ESP), a standard Design Certification (DC), both, or neither. An ESP addresses the site that plant will be built on while a DC describes the reactor design. A COL application must address the information contained in an ESP or a DC if it does not reference them.

Seven COLs have been issued[2] and one application is currently under active review.[3] Five ESPs have been granted and one application is currently under active review.[4] Six Design Certification have been granted, one is under renewal review, and three applications are under active review.[5]

YouTube Encyclopedic

  • 1/3
    Views:
    156 021
    210 249
    115 380
  • Exploring a Sewer Vacuum Truck
  • 16. Portfolio Management
  • US Navy vs Chinese Navy (PLAN) - Strategy & Numbers (2014-2017)

Transcription

See also

References

  1. ^ NUREG/BR-0298 (July 2004). "Nuclear Power Plant Licensing Process" (PDF). NRC.gov. Retrieved 20 July 2017.{{cite web}}: CS1 maint: numeric names: authors list (link)
  2. ^ "NRC: Combined License Holders for New Reactors". NRC.Gov. Retrieved 20 July 2017.
  3. ^ "NRC: Combined License Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.
  4. ^ "Early Site Permit Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.
  5. ^ "Design Certification Applications for New Reactors". NRC.gov. Retrieved 20 July 2017.

Bibliography

This page was last edited on 15 August 2021, at 00:03
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.