To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Chyhyryn Nuclear Power Plant

From Wikipedia, the free encyclopedia

49°05′05″N 32°47′07″E / 49.08472°N 32.78528°E / 49.08472; 32.78528 Chyhyryn Nuclear Power Station (Ukrainian: Чигиринська АЕС) is an unfinished nuclear power plant located to the east of Chyhyryn in Ukraine, on the territory adjacent to the Kremenchuk Reservoir shore, between the villages Stetsivka [uk] and Vitove [uk].

Plan of Chigirinskaya PGPP fossil fuel power station

History

The Chyhyryn Nuclear Power Plant was originally intended to be a fossil fuel power plant, with a capacity of 4.8 MW. The plan to build the Chyhyryn fossil fuel power station was adopted by the Central Committee of the Communist Party of Ukraine in 1970. It was also planned to build a new modern city to house the station workers, with space for 20 thousand inhabitants. In 1981, after repeated project changes, the construction was halted.

In 1982, the Kyiv branch of the Institute "Atomteploelektroproekt" developed a technical and economic conclusion of the construction of a nuclear power plant near Chigirin, and in 1983, the Ministry of Energy of the USSR approved this conclusion, and it was decided on the banks of the Dnieper River to build the nuclear power plant.

According to the decision of the Central Committee of the CPSU and the Council of Ministers of the USSR of September 21, 1984, "On Additional Measures to Ensure Accelerated Development of Nuclear Power Engineering", it was envisaged the construction of a nuclear power plant at Chigirinskaya site with a capacity of 4000 MW. The order of the Ministry of Energy of the USSR No. 539 dated August 23, 1985 was organized by the Chigirinskaya NPP.

Construction work was carried out until 1989, when under public pressure after the Chernobyl Accident, it was decided to stop construction. The point was set by the Resolution of the Council of Ministers of the USSR on May 19, 1989 "On the Termination of the Construction of the Chigirin NPP".[1]

Now the complex of the unfinished nuclear power plant together with the town of power engineers Orbita are abandoned ruins. Empty 9-storey residential buildings, administrative buildings, shops and other infrastructure have been preserved.

Possibility of construction restoration

In 2005, on August 5, Minister of Fuel and Energy of Ukraine Ivan Plachkov officially announced the possibility of restoration of the construction of the Chyhyryn NPP.[2][3] But by 2010, no restoration of construction had taken place. By 2011, the territory of the boiler house was protected by Cherkasyoblenergo [uk]. In 2011, the security was removed, and all boiler rooms were demolished, only the chimney of the boiler house remained intact.

On May 16, 2022, Energoatom CEO Petro Kotin announced that a contract had been signed with Westinghouse to build five AP1000 reactors in Ukraine. Two reactors will be constructed at the Khmelnytskyi Nuclear Power Plant, with the Chyhyryn site being a contender to receive at least two reactors. Construction is planned to begin once the 2022 Russian invasion of Ukraine has concluded.[4][5]

See also

References

  1. ^ "NAU-Online -> Про заходи щодо реалізації постанови З'їзду народних депутатів СРСР "Про основні напрями внутрішньої і зовнішньої політики СРСР"". Archived from the original on 2015-12-10. Retrieved 2019-05-21.
  2. ^ "Матимемо Чигиринську АЕС". postup.brama.com. Поступ. Retrieved 2018-12-03.
  3. ^ "Чигиринська АЕС — те ж саме, що млин на могилі мами". day.kyiv.ua. The Day. 2005-08-09. Retrieved 2018-12-03.
  4. ^ В Україні збудують нову Атомну Електростанцію
  5. ^ "Ukrainian cabinet approves start of work on new Khmelnitsky reactors - Nuclear Engineering International". www.neimagazine.com. Retrieved 2023-07-04.

External links


This page was last edited on 23 March 2024, at 06:23
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.