To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Chiwan station

From Wikipedia, the free encyclopedia

Chiwan

赤湾
Shenzhen Metro
Chinese name
Traditional Chinese赤灣
Simplified Chinese赤湾
Literal meaningRed/Bare bay
Transcriptions
Standard Mandarin
Hanyu PinyinChì Wān
Yue: Cantonese
JyutpingCek3 Waan1
General information
LocationNanshan District, Shenzhen, Guangdong
China
Operated bySZMC (Shenzhen Metro Group)
Line(s)     Line 2
     Line 5
Platforms4 (2 island platforms)
Tracks4
ConnectionsShekou West railway station Shekou West
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code
  • 201 (Line 2)
  • 501 (Line 5)
History
OpenedLine 2: 28 December 2010; 13 years ago (2010-12-28)
Line 5: 28 September 2019; 4 years ago (2019-09-28)
Services
Preceding station SZM Shenzhen Metro Following station
Terminus Line 2 Shekou Port
towards Liantang
Liwan
towards Huangbeiling
Line 5 Terminus
Route map
B2F,     Line 2
(Up arrow Shekou Port)
B2F (Line 2)
(Down arrow Shekou West Depot)
B2F,     Line 5
(Down arrow Liwan)

Chiwan station (simplified Chinese: 赤湾站; traditional Chinese: 赤灣站; pinyin: Chìwān Zhàn; Jyutping: Cek3 Waan1 Zaam6) is the southwest terminal metro station on Line 2 and Line 5 of the Shenzhen Metro. It opened on 28 December 2010. The Line 5 platforms opened on 28 September 2019.[1]

Station layout

G Exit
B1F
Concourse
Lobby Customer Service, Shops, Vending machines, ATMs
B2F
Platforms
Platform      Line 2 termination platform
Island platform, doors will open on the left, right
Platform      Line 8 towards Yantian Road (Shekou Port)
Platform      Line 5 towards Huangbeiling (Liwan)
Island platform, doors will open on the left, right
Platform      Line 5 towards Huangbeiling (Liwan)


Exits

Exit Destination
Exit B North Side of Zuopaotai Road, North Side of Chiwan 6th Road (E), North Side of Hanggang Road (E), Gangji Building, Shanhaijin
Exit C Hanggang Road, Chiwan Village, West Side of Xinghai Boulevard (S), Metro Security Inspection Battalion of Luohu Security Company, Shunsheng Logistics Shekou Warehouse
Exit D West Side of Xinghai Boulevard (N), Shekou Station
Exit E North Side of Chiwan 6th Road (W), Chiwan School, Shanyu Haiyuan

References

  1. ^ "Line 5 extension to open Sept. 28-Latest News-Shenzhen Government Online". english.sz.gov.cn. Archived from the original on 28 September 2019.

External links


22°28′46″N 113°53′56″E / 22.47944°N 113.89889°E / 22.47944; 113.89889


This page was last edited on 1 April 2024, at 09:09
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.