To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Centenario Bridge

From Wikipedia, the free encyclopedia

Centenario Bridge

Puente del Centenario
Coordinates37°20′57″N 5°59′35″W / 37.34917°N 5.99306°W / 37.34917; -5.99306
CrossesGuadalquivir
LocaleSeville, Spain
Characteristics
DesignCable-stayed bridge
Total length565 m
Height102 m
Longest span265 m
History
Opened15 November 1991
Location
Map

The Centenario Bridge (Spanish: Puente del Centenario) is a cable-stayed bridge in Seville, Spain. It crosses over the left branch of Guadalquivir.

History and description

Programmed as part of the infrastructures for the Expo '92, building works took place from 1989 to 1991.[1] Part of the SE-30 [es] ring-road, it displays a total length of 565 metres (1,854 ft), with a main span of 265 metres (869 ft) and a maximum height of 102 metres (335 ft).[2][1] It crosses the river near the Batán harbour of the Port of Seville.[2] The 5 spans are as follows: (48 – 102 – 265 – 102 – 48) m.[2] The bridge has 88 strap cables.[3]

The bridge opened on 15 November 1991.[4] Only featuring 2 lanes of motor vehicles on each side, it soon became a bottleneck.[5]

In July 2018, the Ministry of Public Works presented a project to expand the bridge to 6 lanes (3 lanes on each side). On September 1, 2020, the government opened the bidding for the replacement of the cables, which were at the end of their service life, and the expansion to 6 lanes. It is expected that after several years of delay, the works will be completed in 2025.[6]

References

Citations
  1. ^ a b "Los nuevos tirantes del puente del Centenario permiten otro carril". ABC. 28 January 2020.
  2. ^ a b c Ontañón 1995, p. 119.
  3. ^ Ontañón 1995, p. 123.
  4. ^ Borrero, Juan José (1 July 2003). "El Puente del Centenario se cobra una nueva víctima al chocar un camión y una furgoneta". ABC.
  5. ^ Martín, Alejandro (27 July 2018). "Un proyecto caro y complejo para ganar capacidad viaria". Diario de Sevilla.
  6. ^ "La obra del puente del Centenario de Sevilla se encarece hasta 102 millones y se alarga a 2025". Diario de Sevilla (in European Spanish). 2023-06-15. Retrieved 2024-04-09.
Bibliography
This page was last edited on 9 April 2024, at 22:52
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.