To install click the Add extension button. That's it.

The source code for the WIKI 2 extension is being checked by specialists of the Mozilla Foundation, Google, and Apple. You could also do it yourself at any point in time.

4,5
Kelly Slayton
Congratulations on this excellent venture… what a great idea!
Alexander Grigorievskiy
I use WIKI 2 every day and almost forgot how the original Wikipedia looks like.
Live Statistics
English Articles
Improved in 24 Hours
Added in 24 Hours
Languages
Recent
Show all languages
What we do. Every page goes through several hundred of perfecting techniques; in live mode. Quite the same Wikipedia. Just better.
.
Leo
Newton
Brights
Milds

Bologna San Donato railway test circuit

From Wikipedia, the free encyclopedia

The Bologna San Donato railway test circuit (Italian: Circuito ferroviario di prova di Bologna San Donato) is a railway rolling stock testing facility located in Bologna, Emilia-Romagna, Italy.

The facility started operating in 1942 as a freight yard. For decades, it was the largest Italian railway freight yard in terms of size and traffic. It was made up of 4 main beams, for a total length of approximately 4 km: the arrivals beam (Italian: fascio arrivi), the direction beam (Italian: fascio direzioni), the North departures beam (Italian: fascio partenze nord) and the South departures beam (Italian: fascio partenze sud). It also featured secondary beams.

It is connected to the Bologna ring railway.

The freight yard saw a progressive decline in traffic as early as the 1990s, mainly due to changes in transport policies, which began to favor freight transport on complete trains and the use of freight villages. The launch saddles in Bologna San Donato were closed in 2012; from that moment on, the yard only hosted trains that were carrying out re-composition maneuvers, and it soon became a depot for rolling stock awaiting demolition.[1]

At the beginning of 2018, the decision was made to repurpose the external circulation circuit and build a new curve, so as to form a closed railway path, consisting of an oval about 6 km in length, to be used as a test railway circuit. The first train traveled the new test track on 15 October 2018.[1]

The circuit measures 5759 m in length, of which approximately 2000 m are double tracked. Rails are of the UNI 60 type. The power supply is 3 kV DC.[1]

The maximum speed on the circuit is 120 km/h, which can be increased to 140.[1]

The circuit currently allows test runs of new rolling stock; it also allows testing of rolling stock without a certificate of admission to service from the Italian National Agency for Railway Safety, as the circuit is outside the national railway infrastructure.[1]

Notes

  1. ^ a b c d e Gian Guido Turchi, Bologna San Donato: metamorfosi di un impianto, in I Treni 434 (2020), pages 12–17, Editrice Trasporti su Rotaie, ISSN 0392-4602.

References

This page was last edited on 29 February 2024, at 12:07
Basis of this page is in Wikipedia. Text is available under the CC BY-SA 3.0 Unported License. Non-text media are available under their specified licenses. Wikipedia® is a registered trademark of the Wikimedia Foundation, Inc. WIKI 2 is an independent company and has no affiliation with Wikimedia Foundation.